$1,500.00 - $3,600.00
Min. Order : 1 Set

Acid Gas Absorption Spray Purification Desulfurization Tower For Sale

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Payment Terms: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Condition: New
Usage: waste gas purification
Warranty: 1 Year
Place of Origin: China
Customized service: Yes
After-sales Service Provided: Online support
Showroom Location: None
Raw material: PP, carbon steel or stainless steel
Brand Name: Jiutai
Air flow: 30m3/h
Applicable Industries: Manufacturing Plant
Customized: Acceptable
OEM: yes
Local Service Location: None
ODM: yes
power: 2.2kw
After Warranty Service: Online support
Hebei Jiutai Environmental Protection Equipment Co., Ltd.
Gold Supplier
CN
Manufacturer, Trading Company
≤3h
Response Time
83.3%
On-time delivery rate
-
-
Transactions
Visit Store

-1.jpg

Acid Gas Absorption Spray Purification Desulfurization Tower For Sale

5.jpg

3_02.jpg

The exhaust gas is introduced into the purification tower through the air duct. After the filler layer, the exhaust gas and the sodium hydroxide absorbent liquid are in full contact with each other to absorb the neutralization reaction. The absorption liquid is sprayed down on the top of the tower after being increased by a pump at the bottom of the tower, and then returned to the bottom of the tower for recycling. The purified acid mist exhaust gas reaches local emissions, and the standard discharge requirements meet the discharge standards.

.jpg

-1.jpg

-1(2).jpg

1. The dust removal and desulfurization effect is high. When alkaline washing water is used, the desulfurization efficiency can reach 85%;

2. The equipment occupies less land and is easy to install;

3. Low water and power consumption indicators;

4. Corrosion resistance, no wear, and long service life;

5. Reliable equipment operation, simple and convenient maintenance.

1.jpg

2.jpg

_02.jpg -1(1)_02.jpg -1(1)_03.jpg-1(1)_04.jpg-1(1).jpg

Q1. How about your delivery time?

 

A1: Generally, it will take 7-30 days after receiving your advance payment. The specific delivery time depends on the items , transportation ways and the quantity of your order.

 

Q2. Can you produce according to the samples?

 

A2: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

 

Q3. Is it convenient to install and operate the equipment?

 

A3: Convenient, we will take a one-to-one service for customers, for each customer tailored for your product equipment and a complete set of solutions.

 

Q4. What is your terms of payment?

 

A4: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

 

Q5. Can it really meet the environmental requirements?

 

A5: Ensure that customers meet the environmental standards, the environmental situation of the current 10 mg high emission standards.

 

Q6. What if the equipment is broken?

 

A6: If any problem occurs during the warranty period, we will try our best to solve it and achieve customer satisfaction.After the warranty period of equipment supporting wearing parts to provide 10% discount policy, and to ensure that customers in the use of no worries.

_07.jpg