Custom eletronic stamping parts aluminum

$3.60
100-499 Pieces
$3.50
>=500 Pieces
Min. Order
100 Pieces
GET LATEST PRICE ON APP
Company Information

Dongguan Qiqin Precision Thermal Conductivity Technology Co., Ltd.

CN Manufacturer
Response Time
---
Response Rate:
---
Transactions
US$ 8,000+
3 Years Paid Supplier Supplier Trade Assurance
Learn More

Quick Details

Port: SHEN ZHEN
Payment Terms: T/T
Supply Ability: 50000 Piece/Pieces per Month
Place of Origin: Guangdong China
Brand Name: OEM
Model Number: OEM
Process: stamping
Material: iron
Product name: Professional Precision stamping Parts
Application: electric scooter
Surface treatment: black
Keyword: stamping Parts
Service: Customized OEM stamping service
Name: Customized stamping parts
Equipment: stamping
Item: stamping
Packaging Detail: Bulk packing
Product Description

 logo thanks

 

Product nameAluminum & copper heat sink, Cnc machining part, Aluminum profile, Stamping parts , Hard ware, Plastic part, Die-casting part
MaterialsAluminum, Steel, Stainless steel, Brass, Copper, Bronze, ABS, PC, PO, POM, Nylon, Teflon etc.
FinishAnodized, Oxide, Plating, Brushing, Polishing, Blackened, Powder coating,   Sandblasting, Laser engraving etc.
Inspection EquipmentCMM, Projector, Calipers, Micro caliper, Thread Micro caliper, Pin   gauge, Caliper gauge, Pass meter, Pass meter etc.
CertificationISO 9001
Accuracy

Accuracy Of Machining:+/-0.05mm

Accuracy Of Grinding:+/-0.05mm

Surface Roughness:Ra0.8

Parallelism:0.01mm

Verticality:0.01mm

Concentricity:0.01mm

Drawing format

PDF

DWG/DXF

IGS/STP

Picture

Origin Country

CHINA , DongGuan

MOQ

No Limit For MOQ, Any Quantity Is OK

Lead Time

Extrusion tooling: 20 days after the drawing confirmed

Diecast tooling and plastic tooling : 45 days after the drawing confirmed

CNC sample: within 10 days after the drawing confirmed

Mass Production: 35 days after the sample approval

Package

Product to carton directly with cardboard

Product in Blister to carton

Product in wood box (for heavy product)

Product in inner box to carton

Payment 

For tooling : 100% prepayment

For mass production: 100% prepayment

Adjust based on the order

Service

Delivery on time

Good quality control

Good after-sale services

Provide product design, processing and assembly

 

Company Information

 

FAQ

 4

;