Dissipator amplifier aluminum heat sink case part

$6.00
200-499 Pieces
$5.80
>=500 Pieces
Min. Order
200 Pieces
GET LATEST PRICE ON APP
Company Information

Dongguan Qiqin Precision Thermal Conductivity Technology Co., Ltd.

CN Manufacturer
Response Time
---
Response Rate:
---
Transactions
US$ 8,000+
3 Years Paid Supplier Supplier Trade Assurance
Learn More

Quick Details

Port: SHEN ZHEN
Payment Terms: T/T
Supply Ability: 10000 Piece/Pieces per Month
CNC Machining or Not: CNC Machining
Type: Drilling,Milling,Other Machining Services,Turning
Material Capabilities: Aluminum,Brass,Copper
Micro Machining or Not: Not Micro Machining
Place of Origin: Guangdong China
Model Number: CUSTOM
Brand Name: CUSTOM
Material: Aluminum 1060
Application: Heat Sink
Keyword: aluminium copper heat sink
Finish: Natural Anodise
MOQ: 500
Size: Custom Sizes
PACKING: Standard Packing
Payment Term: T/T
Technology: Extrusion Heatsink Led Lighting
Color: custom
Packaging Detail: bulk packing

Dissipator amplifier aluminum heat sink case part

Product Description

 logo thanks

 

Product nameAluminum & copper heat sink, Cnc machining part, Aluminum profile, Stamping parts , Hard ware, Plastic part, Die-casting part
MaterialsAluminum, Steel, Stainless steel, Brass, Copper, Bronze, ABS, PC, PO, POM, Nylon, Teflon etc.
FinishAnodized, Oxide, Plating, Brushing, Polishing, Blackened, Powder coating,   Sandblasting, Laser engraving etc.
Inspection EquipmentCMM, Projector, Calipers, Micro caliper, Thread Micro caliper, Pin   gauge, Caliper gauge, Pass meter, Pass meter etc.
CertificationISO 9001
Accuracy

Accuracy Of Machining:+/-0.05mm

Accuracy Of Grinding:+/-0.05mm

Surface Roughness:Ra0.8

Parallelism:0.01mm

Verticality:0.01mm

Concentricity:0.01mm

Drawing format

PDF

DWG/DXF

IGS/STP

Picture

Origin Country

CHINA , DongGuan

MOQ

No Limit For MOQ, Any Quantity Is OK

Lead Time

Extrusion tooling: 20 days after the drawing confirmed

Diecast tooling and plastic tooling : 45 days after the drawing confirmed

CNC sample: within 10 days after the drawing confirmed

Mass Production: 35 days after the sample approval

Package

Product to carton directly with cardboard

Product in Blister to carton

Product in wood box (for heavy product)

Product in inner box to carton

Payment 

For tooling : 100% prepayment

For mass production: 100% prepayment

Adjust based on the order

Service

Delivery on time

Good quality control

Good after-sale services

Provide product design, processing and assembly

Company Information

 .jpg

FAQ

 4

;