$18.88
Min. Order : 300 Pieces
$16.88
1000-2999 Pieces
$14.98
≥3000 Pieces

Hot sale Foldable Computer Desk Table for Small Space

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: xiamen
Payment Terms: L/C,T/T,30% TT in advance ,70% against copy of BL. Or L/C at sight
Supply Ability: 10000 Piece/Pieces per Month folding table
Usage: Study Room
Folded: YES
package: PE bag+brown export carton
Place of Origin: Fujian China
tube finish: powder coating
Color: Natural
Specific Use: Computer Desk
Material: metal
Model Number: HY-CP198 folding table
Feature: Foldable,Adjustable (other)
Brand Name: HY
Type: School Furniture
material: steel tube and MDF with pvc
Product name: folding table
other service: OEM service
sampling time: 6- 9 days
Style: PC Desk
General Use: Commercial Furniture
lead time: 35-45 days
packing size: 112*58*10CM
Mail packing: Y
Packaging Detail: folding table with standard brown export package or as customer required.
Zhangzhou Haiyang Furniture Co., Ltd.
Supplier
CN
Manufacturer, Trading Company
≤10h
Response Time
100.0%
On-time delivery rate
US$ 270,000+
22
Transactions
11-50
Employees
1-4
R&D staffs
0
Patents
Visit Store

.jpg

 

PRODUCT DETAIL

  Item No.              HY-CP201
  Name      folding desk
  Color       white,black,ect
  Material       steel tube, MDF, powder coating
  Size  100*50*75CM
  Packing  Polybag, brown export carton
  MOQ  300pcs
  Trade term  EXW, FOB, CIF, ect. 
  Payment term  TT, LC

  Loading port

  Xiamen, China

 

QQ20190422165940.jpg

.jpg

3-.jpg

4-.jpg6-.jpg7-.jpg8-.jpg9-FAQ.jpg

Quality control

1. IQC, Incoming Quality Control when purchasing raw material.

2. IPQC: Input Process Quality Control in every procedure.

3. FQC: Finish Quality Control when products were completed.

4. OQC: Outgoing Quality Control before shipping.

5. Quality Tracking and Quality Improve Meeting after shipping. 

 

Payment terms

1. 30% deposit in advance, 70% against copy of BL. Or L/C at sight.

2. For massive order, detailed payment terms can be negotiated accordingly. 

 

Lead time

1. High season (Sept. to Mar.): 35-40days

2. Low Season (Apr. to Jul.): 25-35 days

3. Trial order or sample order can be flexible by prioritizing.

4. A detailed production schedule for each order will be drew up and it is a platform for further communication between customer and us.

10-.jpg

                                                                                                                         Back to homepage