$100.00 - $200.00
Min. Order : 1 Piece

9002460 Swing Reducer Spare Parts Carrier Assembly for SK135 SY135 RG06D M2X63

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: Jiangmen,China
Payment Terms: T/T,Western Union,Ali Escrow
Supply Ability: 100 Piece/Pieces per Month
Condition: New
Category: Construction Machinery Parts
Warranty: 6 months
Place of Origin: Guangdong China
After-sales Service Provided: Video technical support,Online support,Free spare parts
Showroom Location: None
MOQ: No Limited
Brand Name: BN
Inner Packing: Wrap by Plastic Film
Outer Packing: Carton, Plywood Case
Item Condition: New
Equipment: Apply to RG06D Swing Reducer,Sany SY135 Excavator,Kobelco SK135
Applicable Industries: Machinery Repair Shops,Manufacturing Plant,Farms,Retail,Construction works ,Energy & Mining
Local Service Location: None
Delivery: By Sea, Air, Carrier
After Warranty Service: Video technical support
Application: Replacement
Packaging Detail: INNER PACKING: Wrap by plastic film, clear label for each item. OUTER PACKING: Carton or Plywood Case PACKING SIZE: Depend on packing type
Hongxiang Machinery Co., Ltd.
Supplier
CN
Manufacturer
≤8h
Response Time
100.0%
On-time delivery rate
US$ 190,000+
28
Transactions
51-100
Employees
1-4
R&D staffs
0
Patents
Visit Store

 


  .jpg 

 

9002460 Swing Reducer Spare Parts Carrier Assembly for SK135 SY135 RG06D M2X63

 

  .jpg

 

 

PART NAME

SWING CARRIER ASSEMBLY

EQUIPMENT

Apply to RG06D Swing Reducer

Apply to Sany SY135 Excavator

Apply to Kobelco SK135 excavator

Reducer No.

RG06D

Motor No.

For Kawasaki M2X63

STOCK CODE

9002460

TEETH NO.

18

CATEGORY

Construction Machinery Parts, Excavator Spare Parts

INSTALLATION

Swing Reduction Gearbox

APPLICATION

Replacement

ITEM CONDITION

NEW

LOGO

BN

GROSS WEIGHT

9 KGS

MOQ

1 pc

DESCRIPTION:

 

1. Completely, assembly, and ready to installed in your excavators.

2. Without MOTOR, already been installed the MOTOR SHAFT & MOTOR HOUSING. 

3. All components are produced by us.

4. All new, undamaged.

 

5. Painted or Unpainted, depend on requirement

6. 1000 working hours warranty, call or email with any questions.

7. Plywood Case Packing, free of fumigation

8. Deliver to worldwide by Sea, Air, or Carrier.

 

 

DESCRIPTION:
1. Ready to installed in your SH200A3 excavators. 
2. All components are produced by us.
3. All new, undamaged.
4. 90 days warranty, call or email with any questions.
5. Carton or Plywood Case Packing, free of fumigation
6. Deliver to worldwide by Sea, Air, or Courier.

 

    

.jpg 


  9002460.jpgSH200A3

 

 

 

 .jpg

 .jpg

 

Our Services

  WHY US.jpg

  1. We are the manufacturer and own 18000 m2 factory areas, good relationship with material suppliers, which make more competitive price and steady quality.
  2. We have more than 80 units advanced facilities for production.
  3. We have 8 senior engineers with more than 30 years experience on designing and machining.
  4. Our sales term offer the efficient service for every customers.
  5. We are the long term parts supplier for many famous companies, such as FOSTER WHEELER POWER MACHINERY CO.,LTD and C.R.Dinly etc.
  6. We develop spare parts for old and new excavator models, and submit our latest products to customers every month so that to meet the market demand.
  7. We have high market share in Oversea market and Domestic market, Southeast Asia 65%, Middle East 8%, North and South America 10%,Europe 8%, Russia 5%.

.jpg

 

 

.jpg 
1. Warranty Type:

We will replace the product which have quality problem.
2. Warranty Period:
Supply 3 months warranty for the products from the date of arrival. Customer should check the items according to the order list after arrival. Contact with us and offer the data, photos of the problem items.
3. You need to pay for the replacement charge for following condition:
* Wrong Order from customer.
* Natural Disasters cause the damage.
* Error installation.
* The machine and reducer work over time and over load.
* Lost by any condition.
* Human element destroyed.
* Corrode with rust during stock and running.
* Warranty Expired.
4. Others
They are the product easy to be rust away, please wrap them well. We just supply warranty for the products we are producing, except the Bearing, Seal, and some others we mention before order.If there is any problem about the products, installation or maintenance, please contact with us any time. We reserve the rights of final interpretation.

 

 

 

Packaging & Shipping

  
.jpg 
 

 

TRADE TERMS

EXW, FOB, CFR, CIF

PAYMENT TERMS

T/T, Western Union, Escrow

PORT

Jiangmen Port, negotiation

LEAD TIME

  1. Stock in hand: 4-7 days for processing and packing
  2. Bulk Production: 10-35 days, depend on the quantity.

DELIVERY

By Sea, Air, Carrier

ORDER FLOW

  1. Customers offer the part number, part name, model, quantity, data of items, delivery term.
  2. We quote the best price according to the requirement of customers.
  3. Confirm the purchase order and pay the deposit.
  4. We prepare and pack the goods.
  5. Customers make the payment according to the Proforma Invoice once the goods get ready for delivery.
  6. We delivery the goods with the packing list, commercial invoice, B/L and other documents requested.
  7. Track the transport and arrival about the goods. 
  8. Welcome to give us suggestion and feedback once arrival.

 .jpg


.jpg