$6.50 - $7.50
Min. Order : 100 Kilograms

99.9% cu 550mm 450mm large size out diameter forging DSR oven heating tapered copper pipe

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: Tianjin China
Payment Terms: L/C,T/T
Supply Ability: 200 Ton/Tons per Month
delivery term: 7-10days after receiving the deposit
Place of Origin: Tianjin China
Standard: ASTM B280/EN 12735-1
Ultimate Strength (≥ MPa): 205
Cu (Min): 99.95%
Grade: C11000 C10200 C12000 C12200
Specification: OD:2mm~914mm
Wall thickness: 0.5mm-120mm
Model Number: C12200
payment term: L/C T/T
Elongation (≥ %): 20--40%
Type: Straight Copper Pipe
Alloy Or Not: Non-Alloy,not Alloy
material: C1201,C1100,C1020,C1011,C1220,T1,T2,TU0,TP1,TP2
Length: 1-12m,1m-12m,or as required
Outer diameter: 6mm-800mm
Wall Thickness: 0.2mm~120mm
Package: Standard export seaworthy package or as required.
Outside Diameter: 2mm~914mm
Application: Water Tube,solar water heater refrigerator
Packaging Detail: Standard export seaworthy package or as required.
Tianjin Pengbo Weiye Steel Sales Co., Ltd.
Gold Supplier
CN
Trading Company
≤10h
Response Time
100.0%
On-time delivery rate
US$ 9,000+
17
Transactions
Visit Store
Product Description
Product Name
Solar water heater copper tube pipe
Material
C1201,C1100,C1020,C1011,C1220,T1,T2,TU0,TP1,TP2
place of Origin
China Tianjin
Standard
ASTM EN GB
Outer diameter
6mm-800mm
Wall thickness
0.5mm-120mm
Length
1m-12m,or as required
Package
Standard export seaworthy package or as required.
Products Show
Package
Our Company
Customer photo
Our Certifications
Contact Us
FAQ

Q: Are you trading company or manufacturer ?

A: We are factory.

Q: How long is your delivery time?

A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

Q: Do you provide samples ? is it free or extra ?

A: Yes, we could offer the sample for free charge but do not pay the cost of freight.

Q: What is your terms of payment ?

A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: