Port: | Tianjin China |
Payment Terms: | L/C,T/T |
Supply Ability: | 200 Ton/Tons per Month |
delivery term: | 7-10days after receiving the deposit |
Place of Origin: | Tianjin China |
Standard: | ASTM B280/EN 12735-1 |
Ultimate Strength (≥ MPa): | 205 |
Cu (Min): | 99.95% |
Grade: | C11000 C10200 C12000 C12200 |
Specification: | OD:2mm~914mm |
Wall thickness: | 0.5mm-120mm |
Model Number: | C12200 |
payment term: | L/C T/T |
Elongation (≥ %): | 20--40% |
Type: | Straight Copper Pipe |
Alloy Or Not: | Non-Alloy,not Alloy |
material: | C1201,C1100,C1020,C1011,C1220,T1,T2,TU0,TP1,TP2 |
Length: | 1-12m,1m-12m,or as required |
Outer diameter: | 6mm-800mm |
Wall Thickness: | 0.2mm~120mm |
Package: | Standard export seaworthy package or as required. |
Outside Diameter: | 2mm~914mm |
Application: | Water Tube,solar water heater refrigerator |
Packaging Detail: | Standard export seaworthy package or as required. |
Product Name | Solar water heater copper tube pipe |
Material | C1201,C1100,C1020,C1011,C1220,T1,T2,TU0,TP1,TP2 |
place of Origin | China Tianjin |
Standard | ASTM EN GB |
Outer diameter | 6mm-800mm |
Wall thickness | 0.5mm-120mm |
Length | 1m-12m,or as required |
Package | Standard export seaworthy package or as required. |
A: We are factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below: