Factory price wholesale spiral welding ssaw steel 3pe coated pipe Lowest

$700.00
1-49 Tons
$500.00
>=50 Tons
Min. Order
1 Ton
Company Information

Liaocheng Huiwang Materials Co., Ltd.

CN Trading Company
Response Time
<24h
Response Rate:
87.5%
Transactions
US$ 10,000+
2 Years Paid Supplier Gold Supplier Onsite Check Trade Assurance
Learn More

Quick Details

Port: tianjin.china or qingdao.china
Payment Terms: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Supply Ability: 6000 Ton/Tons per Month
Grade Group: API J55-API P110,10MoWVNb,Cr-Mo alloy,STBA20-STBA26,STPA22-STPA26,Q195-Q345,STB35-STB42,15NiCuMoNb5
Place of Origin: shandong.china
Grade: API J55,10MoWVNb,15CrMo,STBA25,STPA25,Q235,STB35,15NiCuMoNb5
Standard: JIS,DIN,BS,GB
Standard2: JIS G3463-2006,DIN 1626,BS 1387,BS 6323,GB 5310-1995,GB/T 8162-1999
Section Shape: Square
Certification: CE
Outer Diameter: 50*37mm-400*102mm, 50*37mm-400*102mm
Thickness: 4.5 - 9.5 mm
Alloy Or Not: Non-alloy
Product name: channel Steel Pipe
Special Pipe: API Pipe
Product Keywords: 3pe coating steel pipe
Surface Treatment: Galvanized
Technique: Hot Rolled
Application: Structure Pipe
Packaging Detail: Standard packing
Product details


product Name:ERW steel pipe/Welded Pipe/Steel Pipe/Welded steel pipe pile/carbon steel tubing
Size:OD1/2-10"
Wall Thickness0.8-12mm
LengthLess Than 12m
Steel materialQ195 → Grade B, SS330,SPHC, S185
Q215 → Grade C,CS Type B,SS330, SPHC
Q235 → Grade D,SS400,S235JR,S235JO,S235J2
StandardBS EN10296,BS EN10025,BS EN10297,BS6323, BSEN10219,BSEN10217,GB/T13793-1992,GB/T14291-2006, GB/T3091-1993,GB/T3092-1993,GB3640-88
UsageUsed For Structure, Accessorize And Construction
Ends1) Plain
2) Beveled
3) Thread
End protector1) Plastic pipe cap
2) Iron protector
Surface Treatment1) Bared
2) Black Painted (varnish coating)
3) Galvanized
4) With Oiled
5) 3 PE, FBE
TechniqueElectronic Resistance Welded (ERW )
Electronic Fusion Welded (EFW)
Double Submerged Arc Welded (DSAW)
TypeWelded
Welded Line TypeLongitudinal
Section ShapeRound
InspectionWith Hydraulic Testing, Eddy Current , Infrared Test
Package1) Bundle,
2) In Bulk
3) Bags
4) Clients' Requirements
Delivery1) Container
2) Bulk carrier
Port of Shipmenttianjin ,qingdao, China
Date of DeliveryAccording To The Quantity And Specification Of Each Order
PaymentL/C T/T Western Union
OthersFitting as screws and flange also can be supplied.
Company Information
spiral welding ssaw steel 3pe coated pipe

ABOUT US

We are specialized in H beam ,U-steel etc. We have good connection with suppliers. Therefore our delivery time is quite flexible. "Innovation ,Pragmatism ,Integrity and Humanness" is the development principle followed by our company all the time.We are competent and confident that we could make more contribution 

If you are interested in any of our products, please feel free to contact us. We are looking forward to establish good business relationship with you in near future.

READ MORE →
FAQ

FAQ

Q1. What is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, 
we can pack the goods in your branded boxes after getting your authorization letters.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.

Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and 
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, 
no matter where they come from.

Packaging & Shipping

PACKAGE:

Standard export carton packing.

DELIVERY TIME:

3-20 days after confirming order,detail delivery date should be decided according to
production season and order quantity.

spiral welding ssaw steel 3pe coated pipe
Certifications

OUR CERTIFICATES

spiral welding ssaw steel 3pe coated pipe

spiral welding ssaw steel 3pe coated pipe

Related Products
spiral welding ssaw steel 3pe coated pipe
spiral welding ssaw steel 3pe coated pipe
spiral welding ssaw steel 3pe coated pipe
spiral welding ssaw steel 3pe coated pipe