$10,000.00
Min. Order : 1 Set

Semiautomatic automatic phosphating coating line automatic phosphate and pickling line automatic galvanized wire machine

Quick Details

Payment Terms: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Condition: New
Warranty: 1 Year
Place of Origin: Jiangsu China
Machine Type: pickling line
After-sales Service Provided: Free spare parts,Field installation, commissioning and training,Field maintenance and repair service,Video technical support,Online support,No after-sales service
Showroom Location: Kenya
Brand Name: T-control
Substrate: Steel
Type: Coating Production Line
Applicable Industries: Hotels,Garment Shops,Building Material Shops,Machinery Repair Shops,Manufacturing Plant,Food & Beverage Factory,Farms,Restaurant,Home Use,Retail,Food Shop,Printing Shops,Construction works ,Energy & Mining,Food & Beverage Shops,Advertising Company
Key Selling Points: Easy to Operate
Local Service Location: Japan,Argentina,Algeria
After Warranty Service: Video technical support,Spare parts,Field maintenance and repair service
Coating: Galvanizing
Packaging Detail: Wooden case
Wuxi T-Control Industrial Technology Co., Ltd.
Gold Supplier
CN
Manufacturer, Trading Company
60%
Response Rate
0.0%
On-time delivery rate
-
-
Transactions
-
Employees
-
R&D staffs
-
Patents
Visit Store

 

Product Description

Based on years of experience in the metallurgical industry, we have developed a tunnel wire rod surface treatment production line of fully automatic & enclosed type. It's maximum production capacity can reach 300,000 tons/year. Its excellent performance and reasonable price has attracted wire rope customers from China and southeast Asia.

 

Features:

Fully enclosed production -- the production process is conducted in a closed tank, isolated from the outside world;The resulting acid mist is extracted from the tower and purified; Greatly reduce the pollution to the environment; Isolating the effects of the production on the operator's health;

Automatic operation -- fully automatic operation can be chosen to produce continuously;High production efficiency, large output, especially suitable for large output, centralized production; Computer automatic control of process parameters, stable production process;

Significant economic benefit -- automation control, stable process, large output, prominent efficiency and cost ratio;Less operators, low labor intensity; Good stability of the equipment, less vulnerable parts, very low maintenance;

 

Structure of equipment:

1.png

 

From the front view, the production line is mainly composed of the following equipment:

 

Process sink(tank)-- wire rod immersed in it to complete the process;

Tunnel-- totally closed structure, connected with acid mist pipe;

Manipulator-- responsible for the transport of wire rod, depending on the output, equipped with 2~3 sets;

Hook-- carrier for manipulator carrying wire rod;

Flushing mechanism-- mechanical equipment attached to the flushing tank for internal and external flushing of wire rod;

Walkway - for the operators to walk, to check the operation of equipment;

Steel structure-- installed on both sides of the equipment, with track installed on the top, for the manipulator to move; It also acts as a support structure for the installation of tunnels and acid mist pipes.

Acid mist pipeline-- the circulation pipeline for acid mistfrom tunnel to the acid mist tower;

Acid mist purification tower -- extract the acid mist in the tunnel for purification, andproduce negative pressure in the tunnel;

Control system -- electrical control system, used to realize the operation control of the whole pickling line; according to the needs of users, it can realize full automatic control, semi-automatic control and manual control.

 

 

control system:

3.png

Users can set multiple sets of process parameters, each set of process parameters can correspond to a different time in the tank. Users can call different process parameters at any time according to the process requirements to easily realize the production requirements of different processes;

 

Equipment operation mode:
The equipment is a sequential process, no round or repeated processes, making the operation the simplest and most economical.
A. Fill production media, such as acid, phosphating liquid and water, into the tank to reach the required liquid level;
B. Wait for the temperature of production medium to rise to the set temperature;
C. In the loading and unloading waiting area, use forklift or driving equipment to insert the wire rod into the empty lifting hook;
D. Cut the other strapping belt of the wire rod and keep one strapping belt;Or cut off all the strapping, and re-strap;
E. When the loading and unloading area is at the same end of the production line, the manipulator grabs the hook loaded with the wire rod and sends it to the first tank -- hot rinsing tank;When the loading and unloading areas are at different ends of the production line, the manipulator grabs the hook loaded with the wire rod and sends it to the first tank -- water seal tank;
F. After the immersion time arrives or the process is completed, the manipulator grabs the hook and sends it to the next tank successively;
G. After the wire rod has completed all the process in the tank that needs to be used, the manipulator will send the hook with wire rod to the unloading area;
H. Operators use forklift or crane to remove the finished wire rod from the hook;
I. Repeat the process of c~h.

 

 

1.jpg

 

 

 

2.jpg

 

 

 

 

3.jpg

Our Services

We offer industrial automation support. Our skilled and trained team of engineers can offer full system and application support. 

With our services you will enjoy benefits of:

• Attractive cost advantages
• One-stop services of installation, commissioning and maintenance
• Rapid response to issues
• Remote & On-Site Support

Related Offering

1.Electrical Design
• P&ID Review & Process Design Evaluation
• Low voltage power distribution cabinet Design and Production 
• Control Panel Design & Hardware Specification 
• Systems Category Specific Safety Design for Powered Equipment (Electrical, Pneumatic, Hydraulic & Robotic) 
• Complete Electrical CAD Drawing Packages
• Electrical Bid Packages (Written scope of work, conduit schedule, and routing plan)

 


2.Systems & Technology Integration

• Variable Frequency Drive (VFD)
• Servo Drive
• Communication Protocol Implementation
• Barcode Scanning & Vision Systems 
• Radio Frequency Identification (RFID) Technology

 


3.Project Management
• Timeline Development
• Control System Methodology Review & Sequence of Operations (SOP) Development
• Budget Management
• Bid Review & Vendor Selection
• Factory Acceptance Testing (FAT)
• Site Acceptance Testing (SAT)

 


4.PLC/ DCS Programming 

• Processor, Communications, and I/O configuration
• Manual Mode Device Programming 
• System Auto Mode Programming & Sequencing 
• Path Selection & Verification Programming
• System Alarming & Status Programming
• Messaging & Interlock Programming

 


5.SCADA
• Human Machine Interface (HMI) Development 
• Server Configuration & Virtualization
• Software Installation & Configuration
• Client & Thin Client Configuration
• Historical Data Logging
• Data Base Applications
• Overall Equipment Effectiveness (OEE) Performance Tracking
• Data Visualization, Reporting & Dashboards



6.Onsite Comissioning
• Electrical Installation Validation
• Control Paneling Commissioning I/O Checkout
• Testing & Functionality Validation
• Support & Troubleshooting
• Operator Training
• Documentation



7.Equipment
• Automatic Closed Tunnel Wire Rod Pickling Line

 


8.Wireless/Telemetry
• ZigBee
• Bluetooth
• UWB

Testing

100% Factory Tested Prior to Shipment

All our control cabinets are fully tested before they leave our factory. This includes applying power and testing all the branch circuits and testing all I/O points to their terminal blocks. We read inputs back through the PLC and force outputs from the processor to ensure proper operation. Any additional operator controls such as Hand-Off-Auto switches and motor starters are also completely tested.

Company Information

_2019-07-17-66.png

__px_2019.08.14 

Project Display

6537537537374337895634.png 

Related Products

 

_px_2019.07.11        3543636376        46356363

 

 

524354543636356.png        7377356.png

 

 

FAQ

fq.png