Ready to Ship
Fast dispatch
In stock

Cheap Reusable 60 times waterproof fireproof plastic plywood formwork

$29.90
590-799 Pieces
$28.90
800-1199 Pieces
$28.50
>=1200 Pieces
Min. Order
590 Pieces
Choose your specifications
Company Information

Hebei Trico Trade Co., Ltd.

CN Manufacturer, Trading Company
Response Time
<24h
Response Rate:
98.5%
Transactions
US$ 140,000+
6 Years Paid Supplier Gold Supplier Onsite Check Trade Assurance
Learn More

Quick Details

Place of Origin: Hebei China
Brand Name: Trico
Model Number: TR235
Usage: Outdoor
Grade: First-Class
Main Material: Birch
Formaldehyde Emission Standards: E0
Veneer Board Surface Finishing: Double-Sided Decoration
Veneer Board Surface Material: plastic
Product name: Plastic building formwork
Thickness: 12-20mm
Surface treatment: Nano-Coating
Material: PP Plastic Material
Weight: 13-32kgs
Application: Bridge, Tunnel, Tall building
Size: 1220*2440mm/915*1830mm
Feature: Easily Assembled
MOQ: 50 pcs
Reusable: 60 times
Selling Units: Single item
Single package size: 100X200X2 cm
Single gross weight: 22 KG
Package Type: 50-75 Sheets(According to the different thickness)a pallet with carton or according to the customer requires.
Package Preview: https://sc01.alicdn.com/kf/HTB1HAyCO4YaK1RjSZFnq6y80pXav.jpg_640x640.jpg,https://sc02.alicdn.com/kf/HTB1xheOO4naK1RjSZFBq6AW7VXar.jpg_640x640.jpg
Formwork Advantages
What is Plastic Formwork
Hollow plastic building formwork is a kind of energy-saving and green environmental protection product, it is modified by the high-molecular nano-technology, and the original "nano-polymer additive" and the additive can guarantee the toughness of the template while improving the hardness of the template, improve the bending modulus of the template and improve the defects of the conventional plastic building template, The deformation rate of the template is controlled to be within 2mm, the diagonal is controlled within 0.5 mm, and the construction requirement is better met. It is a new product after wood formwork, composite steel formwork, bamboo-wood bonding formwork and all-steel large formwork. It is energy saving and environmental protection,and can completely replace the traditional steel formwork, wood formwork, square wood, What's more, its amortization cost is very low.
ADVANTAGES
1.WATERPROOF
Hollow plastic formwork is weather-resistant, rain and shine are no longer an issue.
2.LIGTH WEIGHT
It is lighter, easier to carry and release worker from heavy labor. Manual operation, no crane required, reduced 20% labor cost than plywood.
3.SURFACE DOES NOT REQUIRE MAINTENANCE
High pressure water jet flusher the surface of the plastic formwork is ok, the metal formwork requires surface maintenance.
4.HIGH WORKABILITY
User-friendly, work well with saw, nail, drill, cut, etc.
Compatible with other mateirals such as wood, steel, aluminum, etc.
5. SAVE COST
One set formwork can finish whole high building 2x35 floors, save 60% total budge than plywood and metal formwork.
6.HIGH TEMPERATUER RESISTANCE
The material is Polypropylene, the melting point can be as high as 167 ℃.
PP vicat softening temperature of 150 ℃.
Product Details

Product size


Size

Thinkness

Weight

Density
container loading(pcs)
20HQ
40HQ
1220*2440mm
12mm
21±1KG
587.8kg/m3
590
1200
1220*2440mm
14mm
24±1KG
575.8kg/m3
510
1080
1220*2440mm
15mm
25±1KG
559.8kg/m3
470
1026
1220*2440mm
16mm
27±1KG
566.8kg/m3
440
936
1220*2440mm
18mm
29±1KG
541.2kg/m3
390
900

12-20mm thickness all we can provide
Product specifications and thickness can be customized to customer requirement

Installation Details

1.Use the hollow building formwork intersecting surface laid with 15mm thick.
2.Wood square of the distance: (1) on the surface of the intersection (spacing: wood square distance according to the thickness of the slab concrete, in general, the thickness of less than 0.15 m floor (spacing is 200 ~ 250 mm.(2) the shear wall (spacing according to adjust the spacing, height and thickness of the wall to wall height of 2800 mm, 300 mm thick wall,  

for example, using the formwork (15 mm thickness spacing is 100 ~ 150 mm, if the shear wall, pillar width more than 1 meter, must add the fixed frame.
3.Die shear wall and column puzzle when leaving no gaps, internal Angle (the bottom of the wall) parts must have wood square, beam, wall, formwork connection.Shear wall made 4 after the mold must be assembled into the whole hoisting, then lay flat, reduce labor intensity, forming effect is good.

4. When the nail to the formwork from the formwork edge distance 15 ~ 30 mm, strength wants moderate, nail nails is 40 ~ 50 mm in length, shoulds not be too long or too short.
5.Beam bottom of a piece of wood square must set aside 15 mm seam allowance, wallboard made on wood square seam allowance, it does not leak slurry and wallboard material saving.

Quality Test Report
Packing & Delivery
Our Company
FAQ

1.Q: Are you a factory or trading company?
A: We are a factory of plastic formwork.

2.Q: How can I get some samples?
A: We are honored to offer you free samples.

3.Q: How does your factory control quality?
A: Quality is priority. We always control from the very beginning to the end , from the raw materials to the production. Every batch of materials, we must test the quality about the impact stength , Vicart , bending strength. Our factory has gained ISO9001:2008.

4.Q: How many times does your formwork reused?
A:It can be reused over 60 times.

5.Q: Does this formwork stick concrete? and easily remove or not?
A:It doesn't stick concrete and easily remove, even no need any release agent, only tapping can fallen off.

6.Q: How to clean the used formwork?
A: Only using the high-pressure water gun can make it clean.

7. Q: what are your foreigh markets?
A: Middle East countries, Africa countries, the eastern European countries,Oceania countries