350kw vertical tube water Biomass pellet heating fired steam hot water boiler

$4,500.00 - $7,000.00
Min. Order
1 Set
GET LATEST PRICE ON APP
Choose your specifications
Company Information

Henan Yuji Boiler Vessel Manufacturing Co., Ltd.

CN Manufacturer, Trading Company
Response Time
>72h
Response Rate:
60%
Transactions
---
3 Years Paid Supplier Gold Supplier Onsite Check
Learn More

Quick Details

Port: Qingdao or Shanghai
Payment Terms: L/C,T/T
Supply Ability: 50 Set/Sets per Month
Applicable Industries: Hotels,Garment Shops,Building Material Shops,Manufacturing Plant,Machinery Repair Shops,Food & Beverage Factory,Farms,Restaurant,Home Use,Retail,Food Shop,Printing Shops,Construction works ,Energy & Mining,Food & Beverage Shops,Advertising Company
Condition: New
Type: Once Through
Usage: Industrial, Laboratory, Home
Structure: Fire Tube & Water Tube
Pressure: High Pressure
Style: Vertical
Fuel: Coal-fired
Place of Origin: Henan China
Brand Name: Yuji Boiler
Output: Steam
Dimension(L*W*H): Depends on Model
Weight: 0.7-5 ton
Certification: ISO, CE, SGS
Product name: hot water boiler
Thermal Power: 350kw
Working Pressure: 0.4/0.7 MPa
Outlet Water Temperature: 95
Thermal Efficiency: ≥83%
Design fuel: various types of coal fuels
Working Life: 10-15 years
Warranty: 1 year
Color: Customization
After-sales Service Provided: Engineers available to service machinery overseas
Warranty: 1 year for free and life-long maintanence
Packaging Detail: Water Proof and damp proof package for LSH hot water boiler host Wooden cases package for LSH hot water boiler auxiliaries
Product Description

LSH series vertical manual coal fired steam boiler, the boiler host mainly made of U-circle, boiler drum, shell cover, furnace, horizontal water tube, vertical tube, convection tubes etc. pressure parts. Set manhole on shell cover, convenient for boiler maintenance and clean. The boiler fire grate on the top of inner furnace U-foot, flame scour furnace and horizontal water tube in furnace. but the furnace temperature lower because of the degree of water cooling is bigger, generally suitable for high caloric value coal fuels. If add building refractory bricks in boiler, keep high temperature in furnace, also can use low caloric value coal fuels. Water cycle is better, all the parts that scoured by flue gas have water cooling. Horizontal water tube on top of boiler host is convection heating area, fire grate tube and furnace on bottom of boiler host is radiation heating area, boiler structure and flue gas path layout reasonable, good heat transfer performance.


Item
Unit
LSH0.1
LSH0.2
LSH0.3
LSH0.49
LSH0.7
Thermal Power
MW
0.14
0.21
0.35
0.49
0.7
Working Pressure
MPa
0.4
0.4
0.4
0.4
0.4/0.7
Outlet Water Temp.
95
95
95
95
95
Return Water Temp.
70
70
70
70
70
Thermal Efficiency
%
≧82
Fuel
/
Coal
Fuel Consumption
Kg/h
35
52
88.4
121.8
176
Heating Area
9.1
11.73
19.57
26.35
36.09
Grate Area
0.36
0.48
0.95
1.13
1.47
Power Consumption
KW
4.5
5.5
9.5
11.5
11.5
Water Capacity
0.88
1.33
1.96
2.82
3.72
Item
Unit
LSH0.1
LSH02
LSH0.3
LSH0.49
LSH0.7
Thermal Power
MW
0.14
0.21
0.35
0.49
0.7
Transport Dimension
φ
mm
910
1020
1320
1420
1620
H
mm
2900
3200
3680
3870
4380
Transport Weight
/
t
0.98
1.6
2.88
3.67
4.8
Outlet Water Valve Pipe Diameter
DN
mm
40
40
50
80
80
Return Water Valve Pipe Diameter
DN
mm
40
40
50
80
80
Safety Valve Pipe Diameter
DN
mm
32
32
32
32
32
Drain Valve Pipe Diameter
DN
mm
40
40
40
40
40
Chimney Diameter
φ
mm
220
280
280
280
280











Quality Assurance

Cutting

guarantee the accuracy of cutting dimension and  the correctness of cutting materials

Rolling

Max Thickness plate is 30 mm

max. width of plate is 2500 mm

 max. diam. of cylinder is 3000 mm. 

Cutting Edge

ensure plate end surface is smooth, and groove size is accurate. Better for group welding pressure parts.

Tube Plate Welding

Bright welding appearance and excellent welding quality.

Automatic Welding

Welding is flat and excellent interface bonding.

X-ray Nondestructive Testing

Orientation and circumferential direction X ray nondestructive testing to guarantee welding seam quality.


Certifications
Other Hot Products

horizontal  electric boiler 

       vertical electric boiler 

       1-20ton Oil Gas fired steam boiler 



      biomass handle boiler 

    biomass chain steam boiler 

      Economizer for biomass boiler 

Packing & Delivery

Seaworthy Exporting Packing

Wooden Cases Packing for Boiler Auxiliaries

Seaworthy Exporting Packing

Water Proof and Damp Proof plastic sheet packing for Boiler Host

FAQ&CONTACT

Q. Are you manufacturer?
A: Yes, we are professional manufacturer of boiler and pressure vessels in Henan, China.
Q: Do you have any Certificate?
A: Yes. Our boiler have got China GB ISO certificates and CE certificate of EU. We also can provide ASME, GHOST and other necessary certificates if you need.
Q: How can I pay you?
A: T/T, Western Union, Money Gram and Ali Trade Assurance is better.
Q: What about the delivery time?
A: 5-10 working days for single machine, and 30-40 working days for bulk order and door to door delivery service is also available.
Q. What about the warranty?
A: We provide 1 year warranty for free and life-long time maintenance
Q. What about installation?
A: We provide 1 or 2 technicians overseas services for installation, debugging and training.





Telephone :0373-2046668

QQ                :3043153539
 
Wechat       : 13137319181

Skype:         :13462287998


;