$1,500.00
Min. Order : 1 Set

50L 100L mini home beer brewing equipment with electric heating

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: Qingdao port for 50L 100L mini home beer brewing equipment with electric heating
Payment Terms: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Supply Ability: 50 Set/Sets per Month 50L 100L mini home beer brewing equipment with electric heating
Keywords: home beer brewing
Welding: TIG welding
After-sales Service Provided: Field installation, commissioning and training
Dimension(L*W*H): Capacity Request
Warranty of core components: 5 years
Processing: Fermenting Equipment
Function: Brewing Beer
Key Selling Points: reasonable price with good quality
Capacity: 50L and 100L
Voltage: Adjustable
Local Service Location: Canada,United Kingdom,United States,Italy,France,Germany,Peru,Mexico,Russia,Spain,Thailand,Japan,Malaysia,Australia,South Korea,Chile,Colombia,Ukraine
Machinery Test Report: Provided
Thickness of Tanks: 3mm
Heating method: Electric heating
Condition: New
Insulation: 60mm
Place of Origin: China
Warranty: 5 years
Control system: Semi-automatic
Showroom Location: Canada,United Kingdom,United States,Italy,France,Germany,Peru,Mexico,Russia,Spain,Thailand,South Korea,Chile,Colombia,Ukraine,Uzbekistan,Japan,Malaysia,Australia
Material: Stainless Steel
Certification: ISO9001 / CE
Weight: Defferent Models
Brand Name: Qihui
Video outgoing-inspection: Provided
Marketing Type: brewery equipment 2020
Core Components: Pressure vessel
Applicable Industries: Hotels,Food & Beverage Factory,Restaurant,Home Use,Food Shop,Food & Beverage Shops,Bar, pub, club
Processing Types: Alcohol
Product name: 50L 100L mini home beer brewing equipment with electric heating
After Warranty Service: Video technical support,Online support,Spare parts
Power: Varies Depending
Packaging Detail: Plywood case and container 50L 100L mini home beer brewing equipment with electric heating
Jinan Qihui Beer Equipment Co., Ltd.
Supplier
CN
Manufacturer, Trading Company
75%
Response Rate
57.1%
On-time delivery rate
US$ 160,000+
9
Transactions
51-100
Employees
1-4
R&D staffs
1
Patents
Visit Store

 

50L 100L mini home beer brewing equipment with electric heating

 

 

Advantage
1. Easy to operate: include all the kits to start to brew, offer instruction manual.
2. Easy to clean:Equip with CIP system and spray cleaning ball.
3. Compact: floor space only 2-3m2.
4. Movable: Equip with wheels
5. Good price:super quality with competitive price
7. Warranty:Main machine 5 years' warranty, auxiliary equipment one year's warranty, all life service.
8. Technology: Fermentation-Double jacket conical fermenter simultaneous brewing, 100% TIG welding.

 

Product Description

 

 

 

50L mini home beer brewing equipment

No. System  Equipments components   Specification  Quantity 
1 Mashing system  Mash/lauter tank/Kettle/whirlpool tank 50L 1
Mash pump 1T/H 1
Pipeline valve  Assorted Assorted
Work platform 
2 Fermenting system  Fermenter  50L  2
3 Glycol cooling system  Glycol liquid tank 100L 1
Glycol chiller 1HP 1
Glycol liquid pump  2T/H 1
Glycol liquid pipeline  Assorted Assorted
4 Control system  Control cabinet Digital control  1
5 Accessories Spare parts (Extra) Assorted 1

 

 

50L

 

 

 

100L home beer brewing equipment

No. System  Equipments components   Specification  Quantity 
1 Milling system  Miller  50-100kgs/H 1
2 Mashing system  Mash/lauter tank 100L 1
Kettle/whirlpool tank 100L 1
Mash pump 1T/H 1
Plate heat exchanger 2m2 1
Wort food hose  Assorted Assorted
Pipeline valve 
3 Fermenting system  Fermenter  100L  2
4 Glycol cooling system  Glycol liquid tank 250L 1
Glycol chiller 1HP 1
Glycol liquid pump  2T/H 1
Glycol liquid pipeline  Assorted Assorted
5 Control system  Control cabinet Digital control  1
6 Accessories Spare parts (Extra) Assorted 1
7 Moveable frame Moveable frame for brehouse and control system Assorted 1
Moveable framer for FV and cooling system Assorted 1

 

 

 

35DE546C-8FB1-4283-9560-AF3B4ADE3F1D

 

DFE2CC11-C120-4262-82E1-4CFFA0F5684C

 

Common Faulty Using

 

Some Common Faulty Operation in Brewery Beer Machine
 
This manual is summarized from some common fault during using or assembling the brewery system in past years. These faulty probably bring irreparable damage to the equipment. So please read it carefully one by one and make sure all items are fully understand.  We keep the right to refuse any compensation because of these faulty and any third party lose or implicative. The items below are just for your stronger attention which are not the whole of the equipment operation.
 
Part 1:Tank
 
Please make necessary pressure test to the tank body and jacket before using to be sure there is no leakage. If there is pressure leakage or liquid leakage, please do firstly get in touch with us. Do not disposal by yourself.
 
Part 2:Pump
 
Do not run the pump without liquid or reversal rotating, or the pump seal will be burned to damage and make pump leak.
 
Part 3:Lauter Tun
 
When there is no wort grant, pressure balance column or pressure difference sensor, the false bottom or tank bottom may be damaged by negative pressure if lautering flow is not controlled very well by adjusting pump speed and valve openning degree.
 
Part 4:Controling Cabinet
 
Make your professional electrician to double check all the terminals in the cabinet have been fastened very well. The terminals may become loose during the long transportation and frequent jounce. Terminal loose between cable and terminal probably burn because of the high temperature, even irreparable damage.
 
Part 5:Glycol Chiller
 
Make sure the refrigerant correct, pressure well, protection sensor work well like flow, pressure etc, or it may block the freon loops or shorten the using life because of overload.
 
The glycol water in the loops should be clean and sterile to avoid blocking the heat exchanger inside, which may reduce the chilling efficiency even some irreparable result.
 
The chiller is better to be placed below the glycol water level to get fully filled liquid in the glycol water pump inside chiller. Or the pump and the seal may be damaged because of dry running.

 

 

brewery equipment (4)

 

 

brewery equipment (12)

 

 

Contact Us

Contact Us

 

 

1529659478(1)