professional prefabricated warehouse steel with metallic roof construction structures

$35.00 - $60.00
Min. Order
50 Square Meters
GET LATEST PRICE ON APP
Choose your specifications
Company Information

Fujian Huacheng Steel Structure Construction Co., Ltd.

CN Manufacturer, Trading Company
Response Time
---
Response Rate:
---
Transactions
---
1 Year Paid Supplier Supplier
Learn More

Quick Details

Port: Qingdao, Shanghai, Ningbo, Shenzhen, Fuzhou, Xiamen
Payment Terms: L/C,D/A,D/P,T/T,Western Union,MoneyGram,Paypal
Supply Ability: 3000 Square Meter/Square Meters per Day
Place of Origin: Fujian China
Brand Name: HCGG
Model Number: steel construction
Type: Light
Application: Steel Fabricated House, Steel Workshop, Steel building,Hotel,House
Standard: AISI,ASTM,BS,DIN,GB,JIS
Grade: steel
Window: Aluminiumn Alloy, PVC, Sandwich Panel etc.
Certificate: ISO9001
Purlin: C type steel
Product name: steel structure
Surface treatment: Painted & Hot dip galvanized
Color: Customized Color
Packaging Detail: 1. Steel Structure. 2. According to container size, standard export package.
Product Description
 

Steel Structure Framed Commercial Office Building, Structural Steel Truss Prefab Construction with Drawing

1.png

 

Project Show

 2.png

 

Packaging & Shipping

 

 4.png

 

Our Services

 

Drawings & Quotation:

1. Various styles can be designed and manufactured according to your needs.

2. As long as you like, we can design and provide drawings for you.

3. In order to give yo an exactly quotation and drawings, pls tell us the : Length,width,eave height and local weather. Quotation will be sent asap.

 

Temrs:

Payment :  L/C or by T/T(30% prepaid as depsit, the balance 70% before shipment)

Delivery time : 15~40 days,usually as customers's order

Shipment : 20'GP, 40'GP,40'HQ, 40'OT or in bulk 

FAQ

 

Steel Structure fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.