High pressure water jet 250 bar concrete surface cleaner

$300.00
1-1 Set
$280.00
>=2 Sets
Min. Order
1 Set
GET LATEST PRICE ON APP
Choose your specifications
Company Information

Qingdao JinRun Machinery Co., Ltd.

CN Manufacturer, Trading Company
Response Time
<24h
Response Rate:
92%
Transactions
US$ 30,000+
1 Year Paid Supplier Gold Supplier Onsite Check Trade Assurance
Learn More

Quick Details

Port: All Chinese ports
Payment Terms: L/C,T/T,Western Union,Trade Assurance
Supply Ability: 100 Set/Sets per Month
Machine Type: High Pressure Cleaner
Applicable Industries: Hotels,Home Use,Construction works&nbsp;
Condition: New
Place of Origin: China
Brand Name: JINRUN
Fuel: Electric
Certification: CE
Use: Burnishing
Cleaning Process: Water
Cleaning Type: High Pressure Cleaner
Power(W): customized
Dimension(L*W*H): customized
Warranty: 1 Year
After-sales Service Provided: Field maintenance and repair service
Color: Customized
Model: JRHC20
Package: Seaworthy Package
Delivery time: 7 days
Spare parts service: Lifetime
Test before delivery: Yes
Warranty time: One year
OEM: Yes
Function: Surface Cleaning Machine
Sample: Available
Packaging Detail: Seaworthy Package
Product Description

 

pressure cleaner (6).jpg

 

pressure cleaner (9).jpg 

pressure cleaner (7).jpg

 

pressure cleaner (12).jpg

Parameter

  

Item

15” Surface Cleaner

18”Surface Cleaner

20”Surface Cleaner

Max Pressure

3000PSI

4000PSI

4000PSI

Max Flow

4GPM

8GPM

8GPM

Max Temp

140°F

180°F

180°F

Inlet

M22-14mm

FNPT3/8″

FNPT3/8″

Application

It can be used to clean the surface of desks, patios, sidewalks, driveways, parking lots and any other horizontal flat surface.

Packing

Cartons

 

Company Information

 

Qingdao JinRun Machinery Co., Ltd. is located in Qingdao West Coast Economic New Zone (formerly Jiaonan City). The company has convenient transportation and strong production strength. It is a high-tech industrialized entity integrating casting machinery, surface cleaning, sand treatment, coating production line and automation equipment research, development, production, operation, export and service. The company has strong research and development strength, advanced production technology, perfect testing methods, scientific management system, as a professional manufacturer of foundry machinery industry, ranked high-end level in the technical, quality and automation. Welcome customers from all over the world to visit and discuss cooperation.

Packaging & Shipping

 

packing.jpg 

Our Services

 

1. Reply your inquiry in 24 working hours.

2. Experienced staffs answer all your questions in fluent English.

3. Customized design is available. ODM&OEM are welcomed.

4. Exclusive and unique solution can be provided to our customer by our well-trained and professional engineers and staff.

5. Special discount and protection of sales are provided to our distributor.

6. Professional factory : We are manufacturer, specializing in producing all kinds of machinery for more than 10 years, competitive with good quantity.

7. As an honest seller, we always use superior raw material, advanced machines, skilled technicians to ensure our products be finished in high quality and stable feature. 

 

FAQ

 

a.       How many days do you need to produce this machine?

It depends on your specific requirement. Some general equipment, we usually have stock. For other customized machines, it needs about 15 to 50 days from engineers designing to production completion.

 

b.       What does your factory do regarding quality control?

 We pay much attention to quality control from the very beginning to the end. Each machine is assembled and carefully tested before delivery. We try our best to ensure each machine is in good operation to our customers.

 

c.       What’s your machine quality guarantee?

 Quality guarantee time is one year. We choose world famous brand components to keep our machine in perfect working condition.

 

d.       Could you give installation and commissioning overseas? How long will it take?

 Yes, we supply overseas service, but customers need to pay for the engineers flight tickets, and hotel, food., etc.

Small machines usually takes 5 days, while large machines usually takes about 15 to 20 days.

 

e.       How can I trust you to deliver the right machine as I ordered?

 We will absolutely deliver a good quality machine as we discussed and confirmed in the order. The core of our company culture is innovation, quality, integrity and efficiency.