Ready to Ship
Fast dispatch
In stock

50L 100L 150L 200L distillery equipment vodka distillation equipment

$2,400.00
1-4 Sets
$1,100.00
>=5 Sets
Min. Order
1 Set
Choose your specifications
Company Information

Daeyoo Tech. Co., Ltd. Wenzhou

CN Manufacturer, Trading Company
Response Time
<24h
Response Rate:
90.3%
Transactions
US$ 9,000+
3 Years Paid Supplier Gold Supplier Onsite Check Trade Assurance
Learn More

Quick Details

Processing: Other
Condition: New
Warranty: 1 year
After-sales Service Provided: Online support
Place of Origin: Zhejiang China
Brand Name: DYE
Model Number: 40 gallons still
Voltage: 220V/380V/Customized
Weight: 85KGS
Processing Types: Alcohol
Certification: ISO CE
Dimension(L*W*H): 600*600*1100
Power(W): 5KW
Applicable Industries: Hotels,Food &amp; Beverage Factory,Farms,Restaurant,Home Use,Retail,Food Shop,Food &amp; Beverage Shops
After-sales Service Provided: Engineers available to service machinery overseas
Name: 150L small capacity home moonshine alcohol whisky gin stills
Material: SUS304 / Red Copper T2/Glass
Spirits: Brandy Gin Vodka Whiskey Rum
Heating method: Electrical Heating
Capacity: 40 gallons still
Column materisl: SUS304 / Red Copper T2/Glass
Bubble caps diameter: DIN 26mm
Polish: mirror
Selling Units: Single item
Single package size: 60X60X110 cm
Single gross weight: 85 KG
Package Type: plywood boxes
Package Preview: https://sc01.alicdn.com/kf/HLB1cOvFVgHqK1RjSZFPq6AwapXab.jpg_640x640.jpg
Related Products
Our Company

Daeyoo Tech.Co.,ltd.

We are one of the large Distillation Equipment R & D Manufacturers in China.

Daeyoo Tech.Co.,ltd. Wenzhou locates in the state-level Wenzhou Economic and Technological Development Zone. It's covering 15,000 square meters. Registered capital of 4.3 million US dollars, the total assets of 13 million US dollars, the main business for Distilling equipment and Beer brewing equipment. The existing staffs 180 people, of which more than 15 people in technology research and development (R&D)team.

AT PRESENT, DYE DISTILLING EQUIPMENT TECHNOLOGY AND QUALITY IS IN LEADING POSITION OF CHINESE MARKET. AND WE HAVE CE, PED, SGS, TUV, UL, ISO9001 CERTIFICATION,DYE PRODUCTS HAVE BEEN EXPORTED TO THE UNITED STATES, CANADA, UK, AUSTRALIA, JAPAN, INDIA, RUSSIA, MEXICO, GREECE ETC MORE THAN 50 COUNTRIES AND REGIONS.

Certifications
CE Certificate

PED Certificate

ISO 9001
Product Description

50L small capacity home moonshine alcohol whisky gin still

Pot 
Red copper T2 / SUS304 / Upper part coppe & bottom half SUS304
Swan neck
Red copper T2 
ball shape & cone shape & inverted cone shape & mashroom shape & etc.
Gin basket
SUS304 / Red copper T2 / Armed Glass & Red copper T2
Column 
SUS304 / Red copper T2
Bubble cap & trays
Red copper T2
Catalyst
SUS304 / Red copper T2
Dephlegmator
SUS304 / Red copper T2           Shell & Tube type
Condenser
SUS304 / Red copper T2           Shell & Tube type
CIP system
SUS304                                             Contains CIP ball, pipe, pump
Supporting
SUS304                                             Supporting leg & Supporting storage tank
POT 
Material: SUS304
Single layer, with thermometer
Electric heating or direct fire heating
Copper Swan Neck
Material: Red copper T2 
Single layer 
With thermometer

Glass Column 

Armed Glass

Tri-clamp connection

SUS304 Column / Copper Column 

SUS304 / Red Copper T2

Tri-clamp connection

Bubble Tray & Caps

Material: Red copper T2 

One tray with 6 bubble cap & 1 overflow pipe

Dephlegmator

Material: Red copper T2 

Shell & tube type

Gin basket

Material: SUS304

Inner with SUS304 sieve plate

Tri-clamp connection

Condenser

Material: Red copper T2 
Shell & tube type

Parrot / Spirits outlet

Material: SUS304

Control box & Electric heater

Electric heating: 5kw / Each

Control box: Customized 

For example: 220 V / 3 Phase / 50 HZ

Equipment process
Packing & Delivery

Small equipment: we will use wodden case;
Large equipmenr: we will use contianer.

Our Service

1. Free quote & drawings;
2. Engineer available to service machinery ouverseas;
3. Free online technique supporting;
4. Welcome to visit our company to test the equipment. 

FAQ

1. Q : How can customer visiting our factory?
    A :  We are in Wenzhou city,Zhejiang Pr.China.which is very near to Shanghai.

           From Shanghai,China to our city, it will take 1 hour by air, and 4 hours by fast train.
           The name of airport is Wenzhou Longwan International Airport.
           The name of fast train station is Wenzhou Nan train station.
           And our factory is very close to airport only 15 minutes by car, and 1 hour by car from fast train station.

2. Q : How can customer know the processes of order?
    A :  We will take photo or video during manufacturing every two weeks to make customer clear about the order. 

           When goods is finished,we will take more detailed photos or video for inspect. 

           You can also come to our factory to inspect by yourself.

3. Q : Do you supply installation equipment in oversea?
    A :  Yes, if need, we can also send our installation engineer to your factory to help you do installation and testing. 

           And you need to provides round-trip ticket and accommodation for our engineer.

           The extra salary of one installation engineer is 200USD/day.

4. Q : How to control quality?
     A : All material we use has material certification.
           Before any piece of brewing and distilling equipment leaves DYE. 

           It goes through a complete quality and assurance control inspection. 

          This inspection assures your equipment meets all specifications and is in proper working order before it leaves our facility and arrives at your door.

5. Q : What is the shipment schedule?
    A :  We will send you photographs of your order being loaded into the shipping container at the factory.
           The shipping container will generally leave port 3-4 days after loading. 

           We will send you a bill of lading and final statement of account within one week of that time.                The bill of lading will include the shipping container numbers. You can track your shipping container.
           Approximately 10 days prior to delivery, we will send you an ETA (Estimated Time of Arrival) notice from the shipping time. 

           Please remember that the listed delivery date is only an estimate, and is subject to port unloading schedules, customs processing, and the dictates of the local delivery truck company.
           You will be directly contacted by the shipping company's local truck delivery services approximately 48 hours prior to the date of delivery to schedule a delivery time.
           If you need to delay the final delivery, there will be a "pull" fee of approximately $100, and a storage fee of approximately $150 per shipping container per day.

6. Q : Which material are the equipment made of?
    A : Stainless steel 304/ stainless steel 316/ C1100 red copper T2