$4.00 - $10.00
Min. Order : 10000 Square Meters

factory cheap prices eps sandwich panel for wholesales

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: Shanghai
Payment Terms: L/C,T/T
Supply Ability: 100000 Square Meter/Square Meters per Month
Place of Origin: Jiangsu China
Warranty: 1 Year
Life Span: over 20 years
Use: roof/wall
Thickness of steel sheet: 0.2-1.0mm
Project Solution Capability: graphic design,3D model design,total solution for projects
Model Number: SP-001
Design Style: Modern
After-sale Service: Online technical support,Onsite Installation,Onsite Training,Onsite Inspection
Density: 8-12kg/m3
Brand Name: ZhongNan
Thickness: 50/75/100mm
Product name: esp sandwich panels
Panel Material: metal
Application: Hotel
Width: 950mm,1150mm
Suzhou Zhongnan Steel Structure Co., Ltd.
Supplier
CN
Manufacturer, Trading Company
≤6h
Response Time
100.0%
On-time delivery rate
-
-
Transactions
11-50
Employees
1-4
R&D staffs
3
Patents
Visit Store

 

 

 

Product Type Rock wool sandwich panel
Thickness 50-200mm
Color Can be customized
Core material EPS, Rock wool and so on
Use Various roofs and walls referring to the large size factory buildings, storages, exhibition halls, gymnasiums etc.
lifetime 15-20 years
Materials Inner is rock wool foam, two sides is color steel sheet
lenth/Width 120cm

 

1 (6).png

Southeast Asia Pop

Europe Most Popular

Related Products
1.jpg 2.jpg 3.jpg 4.jpg
5.jpg 6.jpg 77.jpg 88.jpg

 

.jpg

 

 

.jpg 

Company Information

-12-1.jpg 

FAQ
FAQ

1.Q: Could you please design a new and unique prefab house for me?
A: Absolutely! We are able to provide you with not only construction scheme, but landscape design! One-stop service is our outstanding superiority with no doubt.

2.Q: What should I provide to build a prefab house?

A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don't have any. Simply notify us your requirements, such as the area, usage and the stories of the house. Before long, you'll possess an amazing design.

3.Q: How could I ensure the cost of building a prefab house?
A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

4.Q: How Long does it take to build a light steel prefab house?
A: It depends on the size of the house. Generally, one 50 square meter house five workers 1-3days finished installation, save manpower and time

5.Q: Is it difficult to build a prefab house?
A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool.

6.Q: Does this kind of house can only be used in residential buildings?

A: Absolutely not. It can be used in all kinds of buildings, such as hotel, office, school, entertainment club, light industrial workshop, etc.

7.Q: Is prefab house stable?
A: Set your hearts at rest! You are completely safe living in light steel prefab house even if there are hurricanes of 200km/h and 9-grade earthquake outside.

8.Q: what are the advantages of prefab house compared to the traditional building?

A: Better isolation of sound and heat, Better fireproof and anti-seismic, Wind resistance, Time and labor saving, More usable area, Excellent termite-proof capability

9.Q: Does prefab house look different from the ordinary one?
A: Yes. prefab house is more beautiful and suitable for any style.

10.Q: How do we cooperate on certain project?
A: Firstly, please send us your project details and your requirements. Then we will design accordingly, free of charge. Afterwards, please check and confirm whether you like the drawings. If not, we shall get the drawings revised until your confirmation. Finally, we make a deal on alibaba.com with Trade Assurance.

Project details ---> Drawings for your project ---> Revised drawings ---> Transaction confirmation with Trade Assurance

11.Q: What is the delivery time?
A: Delivery time depends on order quantities. Generally, the delivery time will be 15-25 days after receiving the deposit.