· March Expo 2021 selection
·
$0.05 - $0.08
Min. Order : 1000 Pieces

Industrial EPDM/NBR/SIL/CR Rubber product

Get Latest Price
Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: Yantian Shenzhen
Payment Terms: L/C,D/A,D/P,T/T
Supply Ability: 100000 Piece/Pieces per Day Keyword:Industrial EPDM/NBR/SIL/CR Rubber product
Tolerance: AS568/ISO-3601-1/ISO-3302-M2/per your drawing
HS Code: 4016931000
Place of Origin: Guangdong China
Color: Black/Red/Green/Blue/Yellow/Brown....
Molding Method: Compression Molding
Model Number: Custom Made
Hardness: 30-90 Shore-A or IRHD
Processing Service: Moulding
Brand Name: sp
Specification: As per your drawings
Lead Time: 2 Weeks
Special Need: PPAP Documents
Keyword: Industrial EPDM/NBR/SIL/CR Rubber product
Certificate: IATF 16949
Packaging Detail: Pack in polybag and then in carton box or according to customer's requirement
Splendid Rubber Products (shenzhen) Co., Ltd.
Supplier
CN
Manufacturer
≤3h
Response Time
100.0%
On-time delivery rate
US$ 650,000+
18
Transactions
301-500
Employees
11-20
R&D staffs
0
Patents
Visit Store
Company Information

Company infor.jpgmaterial.jpg 

Certifications

CERT.jpg 

Product Description

1. Over 20 years experience in rubber products and certified 2002-edition ISO/TS16949 in October 2003. Also got the  KTW, DVGW, WRAS certification for compound E7001Z59 in 2008.

2. A wide range of materials can be choosed ,such as NBR, HNBR,FKM/FPM,SILICONE,EPDM,Neoprene,Aflas etc. 

 
3. Special material requirement available: High (300C + ) or low ( -70C ) temperature resistance, ozone resistance , non-conductive, peroxide cured, etc 

4. Thousands of o ring sizes can be supplied.For most AS568 Standard Size,we have the mold.Our molds are all made from superior stainless steel.Can build the molds by ourselves.

5.  OEM/ODM Service are available.Can design and produce variours Non-standard Rubber Parts according to your requirement.

6. Supply rubber parts to end user like Eaton Corporation, General Motors, Ford Motor Company, BMW, etc and serve the steel, medical, automotive, water pool and spa, and industrial pump markets for many years.

Produciton line.jpgDUST.jpgCNC SHOP.jpgaccesory.jpg 

Production Process

Production  process.jpg 

Inspection equipment

QUALITY.jpgCERT.jpgLAB.jpgE.jpg 

Packaging & Shipping
Transport Package: Pack in polybag and then in carton box or according to customer's requirement  
Production Lead Time: 2-3 weeks after deposit payment
Shipping Methods: Ocean freight or Air transportation or Express delivery
FOB Shipping Port: Yantian, Shenzhen,Mainland China

warehouse.jpg 

Our Services

We can offer OEM or according to our customers' designed drawing.

We can provide PPAP documents/PFMEA/CONTROL PLAN/ISIR  for  our customers' special need.

We can reply all of your inquiry at once.

We can solve your question in time.

Welcome to visit our factory to better understanding our  production capacity.

FAC.jpg 

FAQ

 Q1. What is your terms of packing?
A: Generally, we pack our goods in polybag and cartons box. Also available for special package such as paper tube or blister box package. 

 Q2. What is your terms of payment?
A: T/T 50% as deposit, and bal.50% before delivery.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF

Q4. How about your delivery time?
A: Generally, it will take 3-5weeks after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the moulds and fixtures.
Q6. What is your sample policy?
A: We can supply the samples if we have ready parts in stock, but the customers have to pay th freight cost.

 Q7. Do you inspect your goods before delivery?

A: Yes, we make a 100% inspection on our goods before shipment.