15Kw Steam Generator Car Wash Control Panel

$782.45 - $876.34
Min. Order
1 Set
GET LATEST PRICE ON APP
Coupons
2% OFF Get the Coupon
Download the app to enjoy the coupon
Choose your specifications
Company Information

Shangrao Jiangxin Boiler Co., Ltd.

CN Manufacturer, Trading Company
Response Time
<24h
Response Rate:
70%
Transactions
---
2 Years Paid Supplier Supplier Trade Assurance
Learn More

Quick Details

Port: Ningbo/Shanghai/Tianjin
Payment Terms: L/C,D/A,D/P,T/T,Western Union
Supply Ability: 7000 Set/Sets per Month ---Customized steam generator car wash about 35 days
Condition: New
Type: Natural Circulation
Usage: Industrial
Structure: Water Tube
Pressure: Low Pressure
Style: Vertical
Fuel: Electric
Place of Origin: China
Brand Name: Jiangxin
Output: Steam
Dimension(L*W*H): 800mm*445mm*1100mm
Weight: 55kg
Certification: ISO
Warranty: 1 Year
After-sales Service Provided: Engineers available to service machinery overseas
Product: 15 kw steam generator
Rated power: 15 kw
Rated steam capacity: 20 Kg/h
Rated working pressure: 0.7Mpa
OEM/ODM service: Acceptable
Combustion method: Electric heating
Color: Yellow
Custom processing: Yes
Application: Car wash
Material: Boiler steel
Packaging Detail: Plywood case, steel frame, etc. or as customers&#39; demands.
Product description

15Kw Steam Generator Car Wash Control Panel


15kw steam generator car wash control panel adopts professional boiler steel plate and anti-corrosion treatment of the liner. The boiler with low cost, compact structure, big output, high combustion efficiency and environmental-friendly, which has been occupied the market quickly.


The 15kw steam generator parameters are as follows:

Model
LDR0.02-0.7
Rated power
15
Rated steam capacity
20
Rated working pressure
0.7
Saturated steam temperature
171
Water volume
28
Size
800*445*1100
Weight
55
Process flow

Jiangxin is mainly produce all kinds of boilers for customers. The entire production process includes the use of raw materials - processing - product storage.

In the current production process of Jiangxin, six processing workshops are involved with twelve processes. Each process is completed in a specific workshop. The correspondence is as follows:

In the process of production and processing, each workshop team member completes the process content of the workshop. At the beginning of each process, it is necessary to use raw materials and semi-finished products in a specific warehouse. At the completion of each process, semi-finished products and finished products need to be sent to a specific warehouse. Processing of different products will have different processing steps, but the processing workshop and the warehouse for storing items are fixed.

Company Information

Shangrao Jiangxin Boiler Co., Ltd. Is located in Shangrao Economic Development Zero, covering an area of 135 acres, and a building area of about 110,000 square meters. It is a professional boiler manufacturer company with B-class boiler manufacturing certification, which has 16 years' experience in the boiler design, manufacture, installation and service.


The company has advanced production equipment, strong technical force, perfect testing methods and the latest automated control system. Since 2005, the company has established a boiler and pressure vessel welder examination committee. It is the only training and testing base for boilers, pressure vessels and pressure pipes welders in Shangrao City that has been certified by the Quality and Technical Supervision Bureau. In March 2006, it passed the ISO9001:2000 quality system certification and was absorbed by the China Quality Inspection Association as a group member unit.

Packaging & shiping
Packaging
Inner Packing: Bubble film and Molded foam packaging
Outer Packing: Wooden Case
Sample time
6-15 days
Production time
15-30 days after received the deposit
Delivery Clause
FOB, CFR, CIF, Express delivery
Payment Currency
USD
Payment Methods
T/T(30% deposit 70% against bl copy)
L/C
MoneyGram
Western Union
Other payment terms we can negotiate
Exhibition
Service

Guide Installation Service

Service Content: Check the customer's on-site goods, complete the whole process of installation, commissioning, trial operation and official operation. 

Term setting: Execute according to the contract. 

Service details: Our company guides the installation and commissioning of the boiler to ensure the boiler installation quality and commissioning smoothly (service fees are strictly in accordance with our company's charging standards)

Regular Return Visit Service

Service Content: Meet the customer's requirements to carry out the necessary repairs, and collect the feedback information period setting: the first half of the purchase after the use, return once a month; purchase and use within two years; quarterly return visit; purchase for two years After that, return once a year. 

Service details: return visits by means of regular door-to-door and telephone calls, to understand the customer's use of the product, to listen to the customer's opinions; to provide quality services to the customer in a timely manner

Free Training Service

Service Content: Train user side staff time limit: according to the training situations, the trainees are skilled in operation, can only be allowed to operation. Service details: Regularly hold training courses every year, freely train boiler operation management personnel for users to ensure stable and safe operation of boilers. (A separate training course is provided for users with a large number of staff.) 

Lifetime Protection Service Content

Provide various types of furnace accessories, respond to the user's maintenance, transformation requirements set: permanent service details: outside the product quality assurance period, our company still undertakes the after-sales service obligation, that is, to provide customers with product sets and accessories, for customers Solve the problem (the corresponding fee is charged at the cost price)

Contact us
Related products

72 kw electric steam generator

108 kw electric steam generator

3 kw semi-automatic