Gas automatic deep fryer machine 22L churros stainless steel CE

$90.00 - $200.00
Min. Order
1 Set
GET LATEST PRICE ON APP
Choose your specifications
Company Information

Guangzhou New Power Catering Equipment Manufacturing Co., Ltd.

CN Manufacturer
Response Time
---
Response Rate:
---
Transactions
$ 60,000+
4 Years Paid Supplier Trade Assurance Gold Supplier Onsite Check
Learn More

Quick Details

Port: Guangzhou
Payment Terms: T/T,Western Union
Supply Ability: 1000 Set/Sets per Month
Condition: New
Place of Origin: Guangdong China (Mainland)
Brand Name: New Power
Power Source: Gas
Certification: CE
Warranty: Unavailable
After-sales Service Provided: No after-sales service
Material: Stainless Steel(#201)
Net weight: 22kg
Gross weight: 25kg
Dimensions: 580*480*480mm
Paking size: 610*550*480mm
MOQ: 1
Colour: Sliver
Packaging Detail: carton+foam wooden frame wooden box
Product Description
Product Display
Product name 
Gas Deep Frying Machine
Model
DF-72
Volts
/
Power
/
Material
Stainless steel(#201)
Dimensions
580*480*480mm
Net weight
22kg
Gross weight
25kg
 size
/
Packing size
610*550*480mm
Main Products
Company Introduction
Certifications
Our Customers
Customer Reviews
FAQ

1.Q: What Is Your Minimum Order Quantity(MOQ)?
A: We are a manufacturer and generally do wholesales. However, trial oders are also acceptable and welcome!


2.Q: How Can I Pay For My Order?
A: (1).Teleraphic Transfer(T/T): We accept 30% T/T deposit before production and 70% T/T balance before shipment. 100% payment before prduction for sample orders.
    (2).Western Union(W/U): We accept 100% payment via the Western Union.
    (3).Also can be pay on alibaba.

3.Q: What Are The Shipping Costs?
A: (1).Shipping cost is based on number of packages, gross weight of those packages, total package volume and destination port.
(2).We will package your goods in the strong export standard cases, your order will be shipped via the most economical carrier, unless you specify otherwise.

4.Q: How About The Delivery Time?
A: (1).Some of the products are in stock at our warehouse is European plug, generally we need 1~3 days to change the plugs and package them before the delivery.
(2).Regarding to the non-stock products, the lead time is 15-30 days depends on your requirements and quantity.
(3).We will suggest you the fastest shipping methods when you need the products urgently.

5.Q: Can you help us to make our products?
A: Yes sure we can, our company OEM is warm welcome! Our company have 10 year's experience in making kitchen equipment, we are the professional kitchen equipment factory in Guangzhou.