Dual color white and yellow led work light 12v 15w mini 4x4 off road driving light for car, truck and motor

$15.00
Min. Order
5 Pieces
Choose your specifications
Company Information

Guangzhou Loyo Electronic Factory

CN Manufacturer, Trading Company
Response Time
<24h
Response Rate:
90.8%
Transactions
US$ 180,000+
6 Years Paid Supplier Supplier Trade Assurance
Learn More

Quick Details

Place of Origin: Guangdong China
Brand Name: LOYO
Model Number: LY-8030WA
Warranty: 12 Months
Certification: CE, RoHs, IP67, FCC, E-Mark
Car Model: All cars and motorcycle
OE No.: LED WORK LIGHT
Voltage: 9-24V DC
Lamp Type: LED
Power: 15W
Voltage: 9-24V DC
Application: All cars and motorcycle
Optional Color: White/ Yellow
Lens: PMMA
Lumen: 3500lm
Color Temperature: 6000K
Material: aluminum housing
Keyword: white yellow led work light
Selling Units: Single item
Single package size: 0.5X0.5X0.5 cm
Single gross weight: 1 KG

 

 

Product Description

 Dual color white and yellow led work light 12v 15w mini 4x4 off road driving light for car, truck and motor

1Brand:LOYO
LED Power:15W
Operating Voltage:9-24V DC
Waterproof rate:IP 67
LED:high intensity LED chip
Optional Color:

Single Color (White/Yellow) 

Dual Color (White + Yellow) 

Color Temperature:6000K 3000K
Material:Diecast aluminum housing
Lens material:PC
Mounting Bracket:Stainless Steel
Lumen:3500LM
Working Life50000 hours above life time
Warranty:1 year
Application:Car or Motorcycle

 

4263

 

 

Packaging & Shipping

 

QTY: 50pcs/ctn

N.W: 0.91kg/pc                          

Ctn Size:  57*27*28CM 

Gross weight: 14.5KG  

 

 

Shipment & Delivery & Payment 

Postage and shipping info: DHL, EMS, Fedex, UPS...

Leading time: 3-5 days for sample order, 6-15 days for big order.

Payment terms: We accept T/T, L/C, Paypal, Western Union, Alibaba Trade Assurance

Company Info.
Exhibition
Certificate
 
FAQ

 

Q1: What is minimum order quantity?

A1: 1 pcs as sample order is welcome.                                         

Q2: How long is the delivery time?

A2: 3-5 days after accept the full payment or deposit, if for large order, it is 10-25 days. 

Q3: Q:How about the quality control in your company?

A3: We always attach great importance to quality control to make sure our customers finally get what they want.

Q4: What’s the Failure of the lights?

A4: Less than 0.1%-0.3%

Contact
contact.jpg