$20.00 - $130.00
Min. Order : 20 Square Meters

Customized prefabricated steel structure building low cost office hotel factory workshop warehouse steel building

Coupons
2% OFF
Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: Qingdao port
Payment Terms: L/C,Western Union,D/P,D/A,T/T,MoneyGram
Supply Ability: 5000 Ton/Tons per Year
Window: Aluminum Alloy Window
Place of Origin: Henan China
Application Fields: Office Building
Color: Client's Request
Tolerance: ±1%
Grade: Q345 Q235 S235JR S355JR
Standard: AiSi,ASTM,bs,DIN,GB,JIS
Material: Q235 Q345B S235 S355 SS400
Model Number: customization
Processing Service: Bending,Welding,Decoiling,Cutting,Punching
Purlin: C.Z Shape Steel Channel
Name: Steel Structures Warehouse Steel Structure Workshop
Brand Name: Canglong
Type: Light
Drawing design: AutoCAD
Product name: Steel Structure Building
Roofing: Sandwich Panel. Single Steel Sheet
Application: Steel Structure building
Certificate: CE Certification
Packaging Detail: Steel structure: plastic film packing Panel: plastic film packing Hardware: carton box packing Window: plastic film / carton packing
Henan Canglong Steel Structure Engineering Co., Ltd.
Supplier
CN
Manufacturer, Trading Company
97%
Response Rate
100.0%
On-time delivery rate
US$ 1,100,000+
48
Transactions
11-50
Employees
1-4
R&D staffs
0
Patents
Visit Store
our servise

 

_01.png

Material Specification
Length With customers' requirement
Width Single span, double-span, Multi-span
Height With customers' requirement
Column Q235, Q345 welded H section steel
Beam Q235, Q345 welded section steel
Purlin Q235 C channel or Z channel
Vertical and transversal support Q235 angle steel, round bar or steel pipe
Cladding system EPS, PU, Fiber Glass and Rock Wool sandwich panels or corrugated steel sheet with fiber glass wool insulation, available indiffrerent colors and gauges.
Door Sandwich panel sliding door or roller door
Window 1) PVC sliding window, white color, with dimensions according to customers' requirement; Supplied with fly screen.
2) PVC casement window, white color, size is according to customers' requirement.Supplied with fly screen.
Partition wall sandwich panels (EPS, PU, Fiber glass,Rock Wool etc.) available in Different colors&gauges
Brace Q235 round bar
Earthquake-resistance 8 grades
Structure usage Up to 40 years
Finishing options vast array of colors and textures available

 

Project detail

00.JPG

.JPG

 

.JPG

Main material

 

_07.png

_05.png

our factory

1,CangLong Group is a set of steel structure, color steel plate, composite panels, polyurethane panels, steel building caps, concrete integrated residential design and development, production, installation and maintenance.

2,Since the group established 15 years, through continuous improvement of the quality system and management system, we have passed the ISO9001:2008 Quality Management System certification and CE-EN1090 certification.

.png

Packaging Details

 

Main steel frame without packing load in 40'OT.

Pack all the material to the pallet and push into container, roof and wall panel load in 40'HQ!

Wrapped by water prove paper and plastic film, covered by steel sheet.Strapped with steel strips to prevent damage from transportation.

.png

2_02.png

Customer visit

 

2.jpg

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.