galvanized pipe clothes rack diy fire pipe fittings for sewer pipe cap

$0.50 - $10.00
Min. Order
100 Pieces
GET LATEST PRICE ON APP
Choose your specifications
Company Information

Leyon Piping System Co., Ltd.

CN Trading Company
Response Time
<24h
Response Rate:
93.3%
Transactions
US$ 80,000+
2 Years Paid Supplier Supplier Trade Assurance
Learn More

Quick Details

Port: Tianjin
Payment Terms: L/C,D/P,T/T,Western Union,MoneyGram
Supply Ability: 100000 Piece/Pieces per Month
Place of Origin: Shaanxi China
Brand Name: Leyon
Model Number: OEM
Material: Iron
Technics: Casting
Connection: Flange
Shape: Equal
Head Code: Hexagon
Color: Customized
Application: home
Size: 1/2&#39; ~ 6&#39;
Standard: ANSI
Feature: Corrosion Resistant
Thread: BSPP BSPT NPT
Surface: painted
Certificate: UL/FM
Packaging Detail: carton

galvanized pipe clothes rack diy fire pipe fittings  for sewer pipe cap 
Forged Fittings threaded equal tee with BSPT or NPT black tee malleable iron pipe fitting for home decorationForged Fittings threaded equal tee with BSPT or NPT black tee malleable iron pipe fitting for home decoration03

MaterialMalleable Iron,Ductile iron,Grey iron
StandardThread:BSPT(ISO 7/1),NPT(ANSI B1.20.1)
 Dimension:

ASME B16.3,ASME B16.14,ASME B16.39,

BS EN 10242,BS143,BS1256

ISO 49,DIN 2985
Chemical Propety(C %2.4-2.9),(Si %1.4-1.9),(Mn %0.4-0.65),(P% <0.1),(S% <0.2%)
Physical PropertyTensile strength>=350Mpa,Elongation>=10%,Hardness<=150HB
Testing Pressure2.5MPa
Working Pressure1.6MPa
Head shapeBeaded or Banded
SurfaceGalvanized/Black
ColorExpoxy power:Red,White,Blue,Yellow,Green
ModelElbow,Tees,Crosses,Bends,Unions,Bushing,Lateral Braches,Sockets,Nipples,Hexagon/Round,Caps,Plugs,Locknuts,Flanges,Side outlet Tees,Side Outlet Elbows and etc
ConnectionMale,Female threaded 
Shape Equal,Reducing
CertificateFM,UL,CE,AS4020,BSI,ISO9001
ApplicationSuitable for fire piping system, air, steam, water,gas, oil , home decoration , equipment and so on
 Buyer's drawing or designs are available
PackageCartons without pallet
 Cartons with pallet
 Double woven bags
 Or as buyer's requirements
Delivery DetailsAccording to the quantities and specifications of each order
 Normal delivery times is from 30 to 45 days after receiving the deposit

 

07090806.jpg07.jpg08.jpg09.jpg10.jpg11.jpg12.jpg13.jpg