$50.00
Min. Order : 500 Square Meters
$30.00
≥1000 Square Meters

Fast installation Cheap Prefabricated houses home building

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: Ningbo or Shanghai
Payment Terms: L/C,T/T,Against BL
Supply Ability: 10000 Square Meter/Square Meters per Month Turn-key solutions for big prefab caravan projects
Window: Aluminum/PVC window
Wall: EPS wall for pre engineering steel structure building
Place of Origin: Zhejiang China
Size: Height <6m
Use: Carport,Hotel,House,Kiosk,Booth,Office,Sentry Box,Guard House,Shop,Toilet,Villa,Warehouse,Workshop,Plant,prefab caravan
Color: Customized
Crane: no crane
Skylight: Optional
Deck Floor: Galvanized steel decking
Model Number: PTK5V85
Door: Electrical roll-up shutter
Brand Name: PTH
Roof: pre engineering steel structure building single steel
Clerestory: Optional
Packaging Detail: All the parts are packed on steel rack for easy load and unload
Zhejiang Putian Integrated Housing Co., Ltd.
Supplier
CN
Manufacturer, Trading Company
≤7h
Response Time
100.0%
On-time delivery rate
US$ 360,000+
2
Transactions
101-200
Employees
11-20
R&D staffs
0
Patents
Visit Store

1.jpg

Prefabricated Light Gauge Steel Structure buildings 

/

111.jpg3.jpg4.jpg

 

They are all air-tight, heat-tight, warm-keeping, water-proof and anti-corrosive.  

S/N

Item Name

Specification

1

Main Steel Frame

light gauge steel ,Q345B galvanization 275g/m2

2

Wall System

 EPS/PU/rock wool sandwich panel

 ALC panel (autoclaved lightweight concrete)

3

Roof System

Corrugated Sandwich Panel

4

Door

Steel door/sandwich panel door

5

Window

Aluminum/PVC window

6

Ceiling

Gypsum board/PVC/steel plate

7

Floor

Fiber cement board/wooden floor/PVC/ceramic tile

8

Electricity&Plumbing

Customized as clients' requests and local standard

 /5.jpg

31.jpg

 

 11.jpg

 

1.jpg  2.jpg

 Click DOUBLE-C STRUCTURE for more information.

 /

6.jpg7.jpg

/
1.Contact us
Contact us by Phone/Email/LinkedIn/WeChat
2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal.
3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.
4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.
5.Inspection
QC team will make routine inspection in each process,and provide inspection report.
6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.
7.Install
PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.
8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.
 
FAQ

1. Do you provide on-site installation service?

1) Only large projects provide installation services

2) General projects, we can provide Installation guide service based on customers’ request.

3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.

 

2.What’s your delivery time? 

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.

 

3.How to control the quality of your product?

a. quality of the design: think about possible problems in advance and provide a high-quality design solution.

b. quality of the raw material: choose the qualified raw material

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

 

4. How to deal with quality problems?

Warranty is 3 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

 

5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, the service life of double C structure is 20 years

 

6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region:   improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.