Ready to Ship
Fast dispatch
In stock

Aluminum composite panel/aluminum panel aluminium formwork for building concrete forms

$145.00
500-4999 Square Meters
$125.00
>=5000 Square Meters
Min. Order
500 Square Meters
Choose your specifications
Company Information

Jiangxi GETO New Materials Corporation Limited

CN Manufacturer, Trading Company
Response Time
<24h
Response Rate:
100%
Transactions
US$ 20,000+
3 Years Paid Supplier Supplier Trade Assurance
Learn More

Quick Details

Place of Origin: Jiangxi China
Brand Name: GETO
Model Number: 6061-T6-1efc
After-sale Service: Online Technical Support,Onsite Installation,Onsite Training,Onsite Inspection
Project Solution Capability: graphic design,3D model design,total solution for projects
Material: Aluminum 6061-T6
Weight: Average 25-28KG/SQM
Color: Silver white
Thickness: 4mm
Size: 100mm to 600mm in width
Length: 100-2600mm
Brand name: GETO
Application: Building construction
Certificate: ISO 9001:2008 BCA Band-2 Bizsafe
Product name: Flat tie system
Selling Units: Single item
Single package size: 40X20X20 cm
Single gross weight: 20 KG
Package Type: By pallet

Aluminum composite panel/aluminum panel aluminium formwork for building concrete forms

Product Description

If you ask me, what's the Most important thing in the world?

 

Developer and main contractor will tell you the Truth.

 

With the rapid development of economy, Time and Energy becomes particular important.

 

However, GETO Aluminium Formwork System save time and energy for you.

 

After that, you have more valuable time and energy to accompany with your family and friends.

 

Providing one-stop service, GETO Aluminium Formwork let you more assured and comfortable.

autoclaved aerated concrete wall panels

 autoclaved aerated concrete wall panelsautoclaved aerated concrete wall panels

 Aluminium Formwork Benefits

ItemsAluminium formwork
1. MaterialAluminium alloy 6061-T6
2.Installation

After short period of training, workers can easily learn to install and dismantle the formwork.

3.Construction period3-5 days per storey.
4.Machine assistance

Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed if the conventional formwork system was used, such as:

1) Shifting of reinforcing steel rebar into assembly point

2) Removing debris from site

3) Loading and Unloading materials from trucks into site storage area.

5.Quality of formworkThe aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted.
6.Plastering costAs the smooth effect after removing the formwork, there is no need to plaster.
7.Formwork stabilityThe load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting.
8.Scrap valueThe scrap value is about 50% of the new panel.

 

autoclaved aerated concrete wall panels

Company Information

 autoclaved aerated concrete wall panels

 

working shop

 

 

Project site

 If clients require, GETO can provide field specilist to project site for guidance within one month without

 

charge, meanwhile, GETO will invite clients' site supervisor and workers to factory for learning and

 

training.

 

autoclaved aerated concrete wall panels

Construction Effect

 After dismantle aluminium formwork, it can control flatness and verticality 

 

in less than 5mm the wall surface is very smooth, one-time pouring

 

molding, without plastering and second work, saving construction time, energy as well as cost.

 

autoclaved aerated concrete wall panelsautoclaved aerated concrete wall panels

Our Services

1: Your inquiry related to our product & price will be replied within 24hours.
2: Well-trained & experienced staff are to answer all your inquiries professional in English of course.
3: Working time: 8:00am - 18:30pm, Monday to Saturday.
4: OEM is highly welcomed. We have strong R&D team here to help.
5: Your business relationship with us will be confidential to any third party.
6: Good after-sale service offered, please get back if you got question. 

7. Mock up/pre-assemble in factory before delivery. Thus we can avoid some mistakes in advance and correct them.

autoclaved aerated concrete wall panels

 

 

 

  photobank (2)

Exihibition Show

 GETO takes each opportunity to expand business to the world, and bring our products and new technology, providing the best after-serve and create the biggest value and benefits to our clients. We attened oversea exhibition fair every year, in order to let more and more clients to save construction cost and do service for them.

 

autoclaved aerated concrete wall panels

 

 

Packaging & Shipping

PACKAGE:

Standard export carton packing.

DELIVERY TIME:

Within 5-20 days after confirming order,detail delivery date should be decided according to
different projects and order quantity.

autoclaved aerated concrete wall panels
FAQ

 

-Q-:Can I use this set of formwork to another project?

Yes, there are nearly 70% standard panels can be common reused.

-Q-:What's your packing methods?

Protection foam+heat contracted plastic film. / wooden packing(non-fumigation) / Metal pallet or depend on clients special requirement.

-Q-:What's your payment terms?

T/T 30% in advance & T/T 70% upon sending the copy of Bill of Lading, L/ C  100%, or negotiate according to the order status

-Q-:Are you manufacturer or trader?

A: GETO is the manufacturer of aluminum formwork system for 9 years. Our group has 4 factories, cove raged every scaffolding systems.

-Q-:If I don't have construction crew knew well about your forwmork system, what can I do?

Well, we will send one or two field specialists to your construction site for guidance if you require.

-Q-: Do you have pre-mocking up service?

 Yes, we have pre-mocking up service, it depends on customer, sometimes, our clients need the cargo urgently,

then they do not need pre-mocking up, normally, we will do pre-mocking up to our customers.

-Q-: How to proceed an order for aluminum formwork?

1- Please provide completed project drawings to us.

2- GETO design engineer will work out formwork solution base on project drawings, we have a meeting to discussing details solution.

3- Construction details confirmed, sign sales contract, receiving deposit.

4- To work out shell drawings and modulation drawings.

5- Have meeting for confirming model details.

6- Production.

7- Acceptance and check.

8- Shipping.

 

 How to contact us?

Send your inquiry details in the below for "free sample", click "Send" Now !!!
 

autoclaved aerated concrete wall panels