Wholesale Black Round Carbon Erw Welded Steel Pipe Price

$500.00 - $600.00
Min. Order
5 Metric Tons
Get Latest Price
Company Information

Tianjin TF Steel Pipe Co., Ltd.

CN Trading Company
Response Time
<24h
Response Rate:
91.3%
Transactions
US$ 10,000+
5 Years Paid Supplier Gold Supplier Onsite Check Trade Assurance
Learn More

Quick Details

Port: Tianjin
Payment Terms: L/C,T/T,Western Union,MoneyGram
Supply Ability: 10000 Metric Ton/Metric Tons per Month
Secondary Or Not: Non-secondary
Grade Group: 10#-45#,16Mn,A53-A369,Q195-Q345,ST35-ST52
Place of Origin: Tianjin China
Outer Diameter(Round): 21.9 - 219.3 mm
Color: black, oiled
Tolerance: ±1%
Grade: 10#,20#,16Mn,A53(A,B),A106(B,C),Q235,Q345,Q195,Q215,St37,St52,Q195-Q345
Standard: API,ASTM,BS,DIN,GB,JIS,ISO9001
Feature: Anti-corrosion
Standard2: API 5L,ASTM A312-2001,ASTM A53-2007,ASTM A312-2007,ASTM A789M-2001,BS 1387,BS EN10296,BS EN 10297,BS EN 39,BS 31,DIN EN 10217-1-2005,DIN 17175,GB/T 17396-1998,JIS G3464-2006,JIS G3471-1977
Surface treatment: welded and oiled
Certification: API CE IS9001-2000
Section Shape: Round
Thickness: 0.5 - 20 mm,as your requirement
Type: erw pipe,round pipe
Alloy Or Not: Non-alloy
Length: 12m or as your requiremt
Special Pipe: Thick and Thin wall pipe
Surface Treatment: Galvanized, Spray paint,Oiling,2PE, 3PE,Epoxy.
Technique: ERW
Application: Structure pipe, Water pipe,Construction tube
Packaging Detail: 1. Package: package: waterproof plastic bag then bundles with the strip. 2. Loading: if 20ft: not more than 25mt and the length is not more than 5.8m. if 40 ft: not more than 27mt. 3.about the mark: could no mark on the body or mark as your order.
Product Description

What is welded steel pipe?

Welding pipes is one of the simplest and most durable ways to join piping together and steel pipes can simply be welded together with MIG (metal inert gas), TIG (tungsten inert gas or SMAW (stick metal arc) welding. Before welding two pipes together, avoid any gaps between the two pipes. While welding, take measures to ensure the continual alignment of the two pipes. 

Welded steel pipe in the form of welds are divided into straight seam welded pipe and spiral welded pipe. By production method classification: process classification - arc welded pipe, resistance welded pipe, (high frequency, low frequency) gas welded pipe.

Material list

Elements
Chemical Composition%
Mechanical Property
Material
C%
Mn%
S%
P%
Si%
Yield Point
Tensile Strength
Elongation
(Mpa)
(Mpa)
(%)
Q195
0.06-0.12
0.25-0.50
<0.05
<0.045
<0.3
>195
315-430
32-33
Q235
0.12-0.2
0.30-0.70
<0.045
<0.045
<0.3
>235
375-500
24-26
Q345
<0.20
1.0-1.6
<0.04
<0.04
<0.55
>345
470-630
21-22

Specification

Product Processing


2PE AND 3 PE

2PE anti-corrosion (two-layer polyethylene) pipe two-layer PE anti-corrosion structure, the first layer of adhesive (AD), the second layer of polyethylene (PE), two kinds of materials into one, the thickness of the same layer with three PE.This shows that the difference is: 3PE anti-corrosion more than an epoxy powder layer, and epoxy powder corrosion resistance,.

EPOXY TUBE

 Epoxy resin The product is composed of epoxy resin as the main agent of a two-component, high-solid paint. Sub-primer and finish. A component consists of epoxy resin, pigment and additives, additives. Part B is a curing agent formulated with modified amines.

Product Detailed
Packing and Loading

1.Waterproof plastic bag then bundle with strip, On the all.

2.Waterproof plastic bag then bundle with strip,On the end.

3.20ft container: not more than 25mt. and the lenath is not more than 5.8m.

4.40 ft container: not more than 27mt. and the length is not more than 11.8m


Why choose us

Large indoor and outdoor storage of goods, To ensure the supply of goos!
Advanced testing equipment, Ensure first class quality!
Obtaining of international certificate, To ensure our honest!

Our Services

 Your inquiry related to our product & price will be replied within 24hours.
 Well-trained & experienced staff are to answer all your inquiries professionalin English of course.
 OEM is highly welcomed. We have strong R&D team here to help.
 Your business relationship with us will be confidential to any third party.
 Good after-sale service offered, please get back if you got question


Faq
Q1: Are you a factory or trading company?
A: We are an enterprise of both professional production and large sales.
Q2: Can I get some samples?
A: Yes, we are honored to supply you free samples of steel tube.
Q3: What about your payment term?
a) T/T: 30% T/T advance, 70% balance copy of B/L
b) L/C
c) T/T and L/C: 40% T/T advance, 60% L/C
d)Two sides deliberations
Q4: What about the lead time for mass production?
A:Honestly, it depends on the order quantity and specification and the season you place the order.
Q5: What is your terms of delivery?
A:We accept EXW,FOB,CFR,CIF,etc about
ms erw pipe price list . You can choose the one which is the most convenient or cost effective for you.