$6.87
Min. Order : 1 Meter
$6.79
>=100000 Meters

seamless stainless steel tp410 Boiler u bend heat exchanger tubing/ pipe

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: Shanghai
Payment Terms: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Supply Ability: 100000 Meter/Meters per Month
Secondary Or Not: Non-secondary
Shape: U Shape
Keywords: seamless stainless steel U Type Boiler tube
Place of Origin: Shanghai China
Material: stainless steel
Standard: ANSI A213M-2001,ASTM
Grade: 16mn,16mn
Section Shape: Round
Certification: UL, ISO
Brand: TOBO
Outer Diameter: 1 - 96 inch
Thickness: 1 - 600 mm
Alloy Or Not: Non-Alloy
Product name: seamless stainless steel U Type Boiler tube S32205
Special Pipe: U Type Boiler tube
Surface Treatment: Galvanized
Technique: Hot Rolled, Cold Rolled
Application: Boiler Pipe
Delivery Detail: 15days
Packaging Detail: wooden case
Metal Industrial (shanghai) Co., Ltd.
Supplier
CN
Manufacturer, Trading Company
91.2%
Response Rate
96.7%
On-time delivery rate
US$ 230,000+
70
Transactions
11-50
Employees
11-20
R&D staffs
0
Patents
Visit Store

 

Product Description

seamless stainless steel U Type Boiler tube S32205 

Brand Name

TOBO

Product Name

U Type Boiler Tube

Certification

SGS/BV/ABS/LR/TUV/DNV/BIS/API/PED

Place of Origin

Shanghai China (Mainland)

Thickness

SCH10S,SCH40S,SCH80S,SCH160S  (1mm~60mm), or as cutomers' need

Outer Diameter

1/8"~32"  (6mm~830mm),or as customers' requirements.

Length

30 m(Max) or as your requirement

Process

Cold drawn, Cold rolled, Hot Rolled, Hot bend

Surface treatment

Polishing,annealing,bright annealing and acid pickling

Finish

Oil-dip, Varnish, Passivation, Phosphating, Shot Blasting or as requested

Ends

Beveled or plain end, square cut, burr free ,Plastic Cap at Both end

Material

TP304,TP304L,TP304H,TP316,TP316L,TP316Ti,TP309,TP310S,TP314,

 

TP317L,TP321,TP347H,904L,S31803,S32205,S32750 etc.

Standard

ASTM A213,ASTM A269,ASTM A270,EN10216-5,ASTM B622,ASTM B516,ASTM A789,ETC.

Application

Petroleum/Power/Chemical/Construction/GaS/Metallurgy/Shipbuilding etc

Minimum Order Quantity

1pcs

Price

Depending on quantity

Payment Terms

T/T or Western Union or LC

Supply Ability

3,0000pcs per month

Delivery Time

10-50 days depending on quantity 

Packaging Details

PLY-WOODEN CASE OR PALLET

 

 

 

 

 

 

Product Advantage

(1)professional manufacturing 

(2)Good quality control system and service system

(3)Full experienced in export business in steel pipes 

(4)Convenient location for transport

(5)Flexible payment

(6)Huge Supply Capacity Advantage, Timely and Effective Delivery

(7)competitive price,best service,fast delivery

(8)Big discount for repeat customers.

 

 

 

 
 
 

DN15-DN1200 Hastelloy Pipe Alloy UNS N10276 Hastelloy C Pipe B575 / B619
coated spiral welded steel pipeutb.jpg

Company Information
coated spiral welded steel pipe

ABOUT US

 We are one of the Professional manufacturers Exporter  Pipeline products  in China .Our company was established in 1998, the plant covers 550, 000 square meters and a construction area of 6,8,000square meters, existing 260 workers and 45 technicians. We have five branch factories which can supply the best quality pipes, tubes, fittings flanges and related accessories.

Product testing
coated spiral welded steel pipe
Process flow
coated spiral welded steel pipe
 
Certification

coated spiral welded steel pipe

Our Advantages
coated spiral welded steel pipe

WHY CHOOSE US

TEAM

More than 120 top-class mills

EQUIPMENT

A number of advanced equipments

QUALITY

Company with a variety of detection devices

FACTORY

We have five branch factories

If the quantity of order is not very big,we could send them to you by express delivery,such as TNT,DHL,UPS OR EMS etc.

If order is big ,we will advise you use Air Shipping or Sea Shipping through your nominated forwarder agent.Our long-term cooperated agent also available.

FAQ

FAQ

1.  Are you trading company or manufacturer ?

We are manufacturer ,You can see the Alibaba certification.

2. How long is your delivery time?

Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.

3. Do you provide samples ? is it free or extra ?

 Yes, we could offer the sample for free charge but need pay the cost of freight.

4. What is your terms of payment ?

Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shippment.

 
Packaging&Shipping

Package:Standard export carton packing.

Delivery time:stock-45 days after confirming order,detail delivery date should be decided according to production season and order quantity.

 

coated spiral welded steel pipe

Contact us

coated spiral welded steel pipe