More than 15 Years life time double layer roof cold roll forming machine

$6,800.00 - $19,800.00
Min. Order
1 Set
Quick Quotation
Choose your specifications
Company Information

Botou Toppo Machinery Co., Ltd.

CN Manufacturer, Trading Company
Response Time
24h-48h
Response Rate:
85%
Transactions
US$ 10,000+
6 Years Paid Supplier Gold Supplier Onsite Check Trade Assurance
Learn More

Quick Details

Port: tianjin port
Payment Terms: L/C,T/T,Western Union
Supply Ability: 100 Set/Sets per Month double layer roof cold roll forming machine
Condition: New
Type: Tile Forming Machine
Tile Type: Colored Steel
Use: Roof
Production Capacity: 10-15m/min
Place of Origin: Hebei China
Brand Name: Toppo Machinery
Power(W): 4+3KW
Voltage: 380V, 3 phase, 50hz
Dimension(L*W*H): about 7.2*1.3*1.1 m
Weight: about 2.5-3.8 ton
Certification: CE ISO
Warranty: 18 Months
Item Name: Metal Forming Machine
Suitable Material: PPGI, PI, CR, HRB60 Or Equivalent
Color: Blue Or At Buyer's Requirement
Control System: Auto Control
Operation Panel: 7 Inch Touch Screen
Life Time: At Least 15 Years
Required Space: About 30*3m
Workers Needed: 2 Works
Noice: Environment Friendly. Low Noice
After-sales Service Provided: Engineers available to service machinery overseas
Packaging Detail: a.Fit for ocean shipping. b.Main body of roll forming machine fixed to container by 8mm diameter steel wire Rollers and shaft is covered with anti-rust oil; Spare parts in carton box.

More than 15 Years life time double layer roof cold roll forming machine

roll forming machine.jpg

Product Description

Advantages:

1.Same your money. Money is important to run a business.

2.You can produce 2 different panels with 1 set of double layer roll forming machine.

3.Save your working space. For some customer, there space is very limited. With our double layer roll forming machine, You only need 1 space for 2 types of panels. If normal single layer machine, you will need 2 spaces.

 

 Type  Steel Panel Machine
 Suitable Material PPGI, PI, CR, Q235 Or Equivalent
 Control System Auto Control
 Operation Panel 7 Inch Touch Screen
 Warranty 18 Months
 Life Time At Least 15 Years
 Color Blue Or At Buyer's Requirement
 Certification CE, ISO
 Noice Environment-friendly, Low Noise
 After-sales Service Provided Engineers Available To Service Machinery Overseas

 

Details Show

 D11_04.jpg

roll forming machine2.jpg

About Us

_01.jpg

Why Choose Us

_04.jpg 

Payment

There are 3 plans for you.you can choose the best plan.

 a.30% T/T deposit in advance and the balance of 70% is paid after confirmation and before shipping.

 b.Irrevocable LC at sight.

 c.30% TT deposit, and balance DA 60 days for part of countries with extra charges.Please contact me for details if you need this plan.

Delivery time

 1.With 45 working days after received deposit, we will finish the machine.

 2.We will take photos and videos for your confirmation.

 3.You need balance and make delivery within 1 month.After you send the balance, you can book container.

 4.Once the container is confirmed, we load the container within 5 days.

 

Shop hot products
Shop hot products

roll forming machine5.jpg 

Packaging & Shipping

Packaging&Shipping

 

a. Need one 20 or 40 ft container, according to your final drawing.

b. The main body of machine is fixed to container by 8mm diameter steel wire, rollers and shaft is  

    covered with anti-rust oil.

c. Spare parts in carton box.roll forming machine6.jpg

FAQ

FAQ


1. what is your guarantee period?

Guaranteed against malfunctions due to manufacturing defects for 12 months from the date of loading.

 

2. Do you provide training for my workers?

The machine has been installed and tested well before shipping. It is easy to operate.

Normally speaking, our customer follows the instruction book and can operate the machine well.?

You can also come to our factory to check the machine and learn how to operate before shipping. It only needs 2 hours and you can operate well.

 

3. I do not know about the machine and do not know how to install it. Can you install the machine in my factory?

If you need us to send engineers to your factory, you will pay for the travel expense such as visa, round tickets, hotel, food Salary of 80 USD per day per person (from departure from our factory, until we are back to our factory). You also need to take care of his safety.

 

4. What is included in the machine?

The process for work: decoiler→feeding→roll forming→measuring length→cutting to length→product to stand

The whole line includes a manual decoiler, roll forming machine and product stand. when you get the machine in your factory, you just need to do following 3 things, and then you can start working.

a. Put the machine on the flat level ground.

b. Inject gear oil and hydraulic oil.

c. Connect 3 phase electric wire.

Contact Us

_06.jpg

 

If you need any more information, be free to contact us.We will reply within in 12 hours

 

 

Jeffrey Yao
 Company Toppo Machinery Co., Ltd
 Email Jef@ToppMachinery.com
 WhatsApp 0086-15631793989
 Website

 www.ToppoMachinery.com

 YouTube

 www.TouTube.com/ToppoMachinery