High Quality 350kg Heavy Duty 4 Tiers NSF Shelf,Black Epoxy Coated Wire Shelving

$39.00 - $49.00
Min. Order
50 Pieces
GET LATEST PRICE ON APP
Company Information

Zhongshan Changsheng Metal Products Co., Ltd.

CN Manufacturer, Trading Company
Response Time
<24h
Response Rate:
89.6%
Transactions
$ 190,000+
15 Years Paid Supplier Trade Assurance Supplier
Learn More

Quick Details

Port: Zhongshan
Payment Terms: L/C,T/T,Western Union,MoneyGram
Supply Ability: 50000 Piece/Pieces per Month
Type: Storage Holders &amp; Racks
Applicable Space: living room
Installation Type: Standing Type
Classification: Non-folding Rack
No. of Tiers: Four Layers
Use: Sundries
Material: Metal
Feature: Stocked,Eco-Friendly
Place of Origin: Guangdong China (Mainland)
Brand Name: WELLAND
Model Number: HD183672A4E
Main Material: Carbon steel, PP
Finish: Black Epoxy Coated
Size: 18&quot;x36&quot;xH72&quot;
Loading Weight: 350kg
Tube Size: 25x1.2mmt
Wire Gap: 20mm
Out Packing: 1 Set / Brown Box
CTN Size: 93x47x17.5cm
Salty &amp; Spray Testing: 24 hours
Certificate: SGS,NSF
Delivery Detail: Shipped in 25 days after payment
Packaging Detail: CTN Size(cm):93x47x17.5 1 Set / Brown Box
 
Product Description

 _01

Article350kg Heavy Duty Black Epoxy Coated 4 Tiers NSF Steel Wire Shelf Shelving
Item NoHD183672A4E
Dimension18"x36"xH72"
Main Material Carbon steel, PP
Tube Dia25x1.2mmt
Wire Gap20mm
CertificateSGS,NSF
Surface FinishBlack Epoxy Coated
Salty & Spray Testing72 hours
Loading Weight350kg
Outer Packing1 Set / Brown Box
Carton Dimensions93x47x17.5cm

 

Product Feature

-

Hot Products

44_06 

Contact Us

Company Information

_09_10 

FAQ

faq

1,  Does chrome plated wire shelving has better anti-rust capability? What kind of surface finish is better for wet environment use?

Answers:  Our quality of chrome wire shelving is qualified as Japanese order standard, passed the salty and spray testing by SGS organization with result 24 hours 8 Grade . Generally ,chrome plated shelves is better for dry environment use ,while powder coating or zinc plated covered by epoxy finish is better for wet enviornment use .

 

2, What about your lead time of a container order

Answers :  Generally 30 days for first order and 25 days for repeat order if your order are our catalog items.  The delivery time of customized items shall be re-evaluate by your design.

 

3, Whats your advantage in the same trade of wire shelving?

Answers :  Stable high quality control and advanced production technology are our advantage in the same trade , besides, more than 15 years manufacture experiences of wire shelving only increase our working efficiency and capability competition .

 

4, Can you make customized design wire shelves?

Answers : Of course yes ,we are professional of the manufacture on steel wire and round tube products . Welcome to send us new design drawings and OEM inquiry.

 

5, Can you design packing way for clients?

Answers : Yes ,we can offer the designs of brown box packing way and color box artwork for clientss selection and revise the artwork design until received clients final confirmation.

 

6, If the stuffing of wire shelves is overloaded , will it be broken ?

Answers:  No, if the overloading weight is not too much ,the shelf will still be in good condition . maybe the middle of shelf is a little bended. 

 

7, What kind of testing will you do for these wire shelving racks?

Answers:  Generally ,we would do salty & spray testing ,  coating thickness test, corrosion resistance test, loading capacity test, tension test, shelf center distance test and packing dropping test at our factory testing & inspection room

 

8Will you offer free samples ?

Answers:   We would offer free samples 1 set for our oversea clients ,but express freight collection.

 

9, What is the MOQ ? How about the payment way ?

Answers: It is 50 sets per item . Our payment way is generally T/T 30% deposit, balance against copy shipping doc .  or L/C at sight .

 

10, Where is your factory ? Can we visit it?

Answers: Our factory is situated in Zhongshan city of Guangdong Province ,around one and half hour driving distance far from Guangzhou airport. If you would like to visit our factory ,please feel free to contact us so that we can arrange a car to pick up you at any city of Guangdong province

Back To Home