Dry land gold selecting equipment

$28,000.00 - $125,000.00
Min. Order
1 Set
GET LATEST PRICE ON APP
Company Information

Qingzhou Dongfang Environmental Protection Machinery Manufacturing Co., Ltd.

CN Manufacturer
Response Time
>72h
Response Rate:
66.7%
Transactions
---
9 Years Paid Supplier Gold Supplier Onsite Check
Learn More

Quick Details

Port: QingDao
Payment Terms: L/C,T/T,Western Union
Supply Ability: 20 Set/Sets per Month Dry land gold selecting equipment
Condition: New
Type: Sprial Separator
Production Capacity: 20t/h
Place of Origin: Shandong China
Brand Name: DongFang
Model Number: DF6-1
Voltage: 220V/380V
Power(W): 50hz15kw
Dimension(L*W*H): 4700*2000*2200(mm)
Weight: 3T
Certification: ISO 9001
Screening part of the host: LXJ-20(Screen material for 40Cr)4700*2000*2200(mm)
Generator Set: 50hz15kw, Host:chang chai Alternator:qianghui
Water pump: U-80-125 power :5kw,Q120 H16.5
Power Distribution Box: brand:Delixi control:1. Screening part of the host 2. Water pump
Fixed chute: 6x1(m)
Long wool carpet: 4m Mitsubishi(Japan)
Velvet Gold felt: 2m (domestic)
Water separator: For er separator(Adjustable pressure)
Hardened reducer: ZQ-250
Driving force motor: 5.5kw
Warranty: 1 Year
After-sales Service Provided: Overseas third-party support available
Delivery Detail: 7-15day
Packaging Detail: container transport

1

number

project

parameter

Remarks

A

Manufacturer

Dong fang environment machinery Co., Ltd.

ISO 9001-2008

 

G

Treatment quantity

         20t/h

 

H

Total weight of equipment

          3T

 

R

Total equipment power

          30kw

 

 

Price

   FOB QingDao 28000 USD

 

 

Product Description

 

1.ntroduction

 

[1, industrial and mining and operation requirements]

 

This equipment industrial and mining operation characteristic, the work area is the dry land sand gold mine, the installation

 

Equipment is required to find a 20-20m flat place. The equipment needed to meet the 20 tons per hour of treatment of gold and gold mine.

[2, the use of conditions]

Ambient air temperature: 500C

Ambient air temperature: -100C

River (SEA) water the highest temperature: 320C

2. suitable for job requirements:

Dry land, river alluvial gold ore dressing operation requirements of operation. Working sandy:

The main soil containing less than 30% by fine, medium and coarse sand. Process flow of gold equipment:

The equipment is mainly used for dry land sandy beach, river channel is a kind of gravity concentration equipment is mainly used for the recovery of gold in the sand gold mine and vein ore.

Work flow   feeding hopper---- drum sieve------ gold chute suspension 

1.working principle

The equipment (loader or excavator) will be in the sand gold storage hopper by water flushing

 

Washed into the drum sieve, in the drum screen stir sieved and fine material into chute above it against gravity will be heavy metals in gold blanket on the rest of the sand flow waste pool in.The equipment (loader or excavator) will be in the sand gold storage hopper by water flushing

Washed into the drum sieve, in the drum screen stir sieved and fine material into chute above it against gravity will be heavy metals in gold blanket on the rest of the sand flow waste pool in.

  

The machine integrated fixed chute and jig sorting principle and characteristics, to overcome the agglomeration phenomenon of fixed chute, greatly improve the gold recovery rate of ore dressing and processing cycle for four hours, the yield of gold concentrate is 0.2% recovery rate in more than 80%. The machine has the characteristics of compact structure, light weight, small installation elevation, simple operation, reliable operation, easy maintenance and convenient movement.

QQ20170430114454.pngQQ20170430114518.png

 

Our Services

 

Be careful: the attention of equipment

1, equipment must be firmly grounded

2, check the engine oil before working

3, equipment operation is strictly prohibited by hand to touch the operating site

4, equipment operation is strictly prohibited to open the gold rush.

5, equipment downtime will be timely clean mineral in the chute

6, anti flushing water must be               

Equipment operation:

Run before check

Check equipment connection parts are reliable

Check the tightness of the belt is suitable for any damage

Check if the screw is tightened

Check whether the closed chute.

Check whether there is oil in the diesel engine.

Company Information

 

Sales Manager:      Abu-Baker  . Wang

T  e  l    :   +86-536-3830522   +86 15165655661

After sales service: 0536-3830922

Whats APP:+86 15165655661

skype:wangjiaqing128

Email:abubakerQQ20170430115825.pngcndongfang.net

website:www.fongfangcn.cn

QINGZHOU CITY DONGFANG ENVIRONMENTAL PROTECTION MACHINERY CO. LTD.