ISO9001 OEM Stainless Steel Aluminum Custom Sheet Metal Fabrication Parts

$0.10 - $9.90
Min. Order
1 Piece
GET LATEST PRICE ON APP
Company Information

Dongguan Shengjia Hardware Products Co., Ltd.

CN Manufacturer, Trading Company
Response Time
<24h
Response Rate:
81.8%
Transactions
US$ 10,000+
11 Years Paid Supplier Supplier Trade Assurance
Learn More

Quick Details

Port: Shengzhen
Payment Terms: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Supply Ability: 2000 Piece/Pieces per Day
Place of Origin: Guangdong China
Brand Name: OEM
Model Number: S-001
Material Capabilities: Steel,Aluminum,Alloy
Precision Control: +/- 0.05mm
Finish: Painting, Powder coating, custom
Process: Stamping, Bending, Fabrication
Service: Custom Fabrication Services
MOQ: 1
Assembly process: According to custom requirements
Drawing&#39;s Format: PDF file,JPG,2D file,3D file,etc
Item: Sheet Metal Fabrication
Certificates: ISO9001:2015, PPAP, IATF16949
Packaging Detail: Box,Carton, poly box or plastic bog or according to requirements

Fabrication-1203_01.jpg

 

  • 26 years build in Dongguan China for sheet metal fabrication, metal stamping parts. 
  • The 10th year to listed in Alibaba.
  • Stamping parts, metal spring, enclosures, brackets, terminal parts, deep drawing parts, etc. 
  • Factory under ISO9001:2015, PPAP, IATF 16949.
  • In-house molding workshop.
  • In-house industrial testing facility. 
  • Team of engineers, project management to ensure clear communicaition and quality delivery.

 

 

Fabrication-1203_06.jpg

 

PRODUCT RANGEMetal stamping parts, welding parts, drawing parts, metal punch parts, CNC metal parts, Metal chassis, metal cabinets, metal cases, metal enclosures, metallic auto parts,sheet metal parts,
OEM mold design and fabrication
MATERIAL AVAILABLECarbon steel (CRS/SPCC, SECC,etc),stainless steel, spring steel, Bronze
(berylium, phosphor, etc), brass, copper , aluminum alloy.
FINISHZinc/nickel/chrome/tin plating(coloring or natural), galvanization, anodizing, oil
spraying, powder coating, polishing, passivate, brush, wire drawing, etc.
ENGINEERING TOLERANCE +/- 0.03-0.05mm
PROCESSINGStamping mould, continuous mold, stamping , tooling making, samples approval, CNC cutting,
welding, bending and forming, finishing, assembly
Tolerance Stamping parts:0.01-0.1mm, CNC machining parts:0.1-0.002mm

Fabrication-1203_20.jpg

 

Why Choose Us

 Fabrication-1203_12.jpgFabrication-1203_13.jpg

 OEM & ODM, Standard or Non-Standard 

 Available, Customization, Non-Standard

Drawing Format RequiredAuto CAD(IGS, STP, STL and X-T), DWG, PDF, Pro/Engineer, SolidWorks, 
Tooling/MoldingContinuous Mold, Single Mold
Fabrication ServiceStamping / Punching, Bending, Welding, Laser Cutting, Sheet Metal, etc
Sample Time5 -7 Days
Supply Capacity600,000pcs ~ 800,000pcs / Week
MOQAccept 1pcs sample


 

 

Our Company Profile

Fabrication-1203_23.jpg

The Team

Jun Ping JuOwner18+ years in metal parts fabrication engineering experience+86 769 86186936
Ivy DingVice president10+ years in metal parts fabrication. Specialized PMC scheduling+86 15913833300
Jian LuEngineering Manager12+ years engineering experience in metal fabrication+86 769 86186936
Tina LinPM Manager 8+ years PM experiece in metal parts projects+86 13726416889
Ruitian HuangQuotation Engineer15+ years in metal parts cost analysing. Specialized in tooling and products cost optimizing+86 769 86186936

 

Fabrication-1203_25.jpg

Fabrication-1203_30.jpg

Fabrication-1203_33.jpg

 

FAQ

Q: Are you trustful? 

A: This is the 1th from startup of this commpany and the 10th year listed in alibaba offical system. You are welcomed to require any profile of this company from Alibaba offical. 

 

Q: How about your engineering skills?

A: We deserve a sample try based on our past successful project experience

 

Q: How about costing?

A:  Our costing is based on material/labor/overall/profit. We are well managed factory. No middleman cost added.

Q: How about the Delivery time?

A: Generally it is 5-10 days for samples and15-20 days after molding or sample confirmed.

Q: How about your commmunicaiton skill?

A: We are a team full of experience with worldwide customers. You dont feel worry about your project management and the logistics.

;