ASTM A335 P11 P22 P91 carbon steel seamless pipe / high pressure steam boiler pipe

$800.00 - $850.00
Min. Order
1 Ton
GET LATEST PRICE ON APP
Company Information

Guangzhou Kingmetal Steel Industry Co., Ltd.

CN Trading Company
Response Time
24h-48h
Response Rate:
61.5%
Transactions
$ 10,000+
11 Years Paid Supplier Trade Assurance Gold Supplier Onsite Check
Learn More

Quick Details

Port: Chinese main port
Payment Terms: L/C,T/T
Supply Ability: 10000 Metric Ton/Metric Tons per Month
Standard: ASTM
Standard2: ASTM A213-2001,ASTM A335-2006,ASTM A333-2005,ASTM A179-1990,ANSI B36.10M-2004
Grade Group: Cr-Mo alloy,A53-A369
Grade: 10CrMo910,12CrMo,Cr9Mo,12Cr1MoVG,A335 P11,A335 P5,A335 P91,A335 P9,A335 P1,A213,A333 Gr6,A335 P12,A335 P92,A335 P23
Thickness: 1 - 14 mm
Section Shape: Round
Outer Diameter(Round): 15 - 88.9 mm
Place of Origin: China (Mainland)
Application: Boiler Pipe
Technique: Hot Rolled
Certification: ISO
Surface Treatment: oiled
Special Pipe: API Pipe
Alloy Or Not: Is Alloy
Secondary Or Not: Non-secondary
standard: A335
Length: 3-11.8M
Size: OD 8--88.9MM
Product name: steam boiler pipe
steel grade: P11 P22 P91
pipe type: carbon steel seamless pipe
Packaging Detail: in bundles by metal strips, caped both ends, outside covered polyethylene sheet ,

 KINGMETAL offer you:

1.       FACTORY DIRECT PRICE

2.       NICE QUALITY, REFUND MONEY IN CASE OF BAD QUALITY

3.       QUICK DELIVERY TIME WITH IN 15 DAYS                                              
4.       CURRENCY: USD, RMB,EUR,JPY,HKD,GBP,CAD,AUD,SGD

5.       SUPPORT 7 DAYS REFUND

6.       ACCEPT TRADE ASSURANCE ORDER, YOUR MONEY IN SAFE

7.       AFTER SALES SERVICE 24/7

 

steam boiler pipe,boiler steel pipe tee,boiler reheater tubes .

 

Production12Cr2Mo / P22 alloy steel seamless pipe
steam boiler pipeStandardASTM A213 ,A335,A519,EN10216-2,JIS G3458,G3462,G3467,GB5310,GB9948
steam boiler pipeOut Diameter10-273.1mm
steam boiler pipeWall Thickness1-14mm
steam boiler pipe Material 
Cr5Mo (T5 P5 STFA 25 STPA25 STBA25)
 
15CrMo (T12 P12 STFA22 STPA22 STBA22)
 
1.25Cr0.5Mo (T11 P11 STFA23 STPA23 STBA23)
 
Cr9Mo (T9 P9 STFA26 STPA26 STBA26)
 
12Cr2Mo (T22 P22 10CrMo910)
 
10Cr9Mo1VNb (T91 P91)
 
12Cr1MoV
 
12Cr2MoWVTiB (R102)
steam boiler pipe Length1-12m or as customers required
steam boiler pipeSurface treatmentBlack painting, black varnish, transparent oil, epoxy coating, etc.
 TechniqueSeamless 
 steam boiler pipe Usage 1.  Low and middle pressure fluid transportation pipeline
 2.  Casing Tube
 3.  Boiler Pipe
 4.  Petroleum and natural gas industry
 5.  Chemistry industry
 6.  Electric industry
 steam boiler pipe Package 1.  Bundle packing.
 2.  Bevelled end or plain end or vainished as buyer's required.
 3.  Marking: as per customer's requests.
 4.  Painting varnish coating on the pipe.
 5.  Plastic caps at ends.
 Supply 1.  Seamless steel pipe
 2.  steel casing
 3.  tubing
 4.  hot-rolled steel pipe
Min Order QuantityAccording to customer's requirement
Payment termsL/C, T/T, 
ContactMS wanfury
Email:sales5(@)kingmetal.com.cn

End Shape

Beveled end, plain end, vanished, or adding plastic caps to protect the two ends as per customer's

 requirements

Surface 

Treatment

Oiled, Galvanized, Phosphate etc

Technique 

Cold drawn & cold rolled

Application

1. Automotive and mechanical pipes

2. Petroleum cracking pipes

3. High Pressure Boiler Pipe

4. Low and middle pressure fluid transportation pipeline

5. Chemical fertilizer equipment pipes

6. Heat exchanger pipes

Delivery 

Conditions

1. BK (+C) 

No heat treatment after last cold forming process.

2. BKW (+LC)

After last heat treatment there is a light finishing pass (cold drawing)

3. BKS (+SR)

After the final cold forming process the tubes are stress relieve annealed.

4. GBK (+A)

After the final cold forming process the tubes are annealed in a controlled atmosphere.

5. NBK (+N)

After the final cold forming process the tubes are annealed above the upper transformation

 point in a controlled atmosphere. 

Package

1. Bundle Packing.

2. Plain end or vanished as per customer's request.

3. Wrapped in waterproof paper.

4. Sackcloth with several steel strips.

5. Pack in heavy tri-wall boxes.

   steel pipe steel pipes steel pipe steel pipes  steel pipe steel pipes steel pipe steel pipes  steel pipe steel pipes steel pipe steel pipes  steel pipe steel pipes steel pipe steel pipe

Steam boiler pipe Product show

5 inch P11-2.jpg

 

WHAT WE DO ?

 what we do of carbon steel seamless pipe ?_.jpg 

Application.

 carbon steel pipe packing

 _.png

Company Information

6_07_ 

Our Services

6_10