$7,400.00 - $10,800.00
Min. Order : 1 Set

automatic beer can washing and filling machine

Get Latest Price

Quick Details

Port: Qingdao, China
Payment Terms: L/C,D/A,D/P,T/T,Western Union,MoneyGram,Different payment terms against different countries
Supply Ability: 200 Set/Sets per Month
Condition: New
Place of Origin: Shandong China
Packaging Type: Barrel,CANS,kegs
After-sales Service Provided: Engineers available to service machinery overseas
Dimension(L*W*H): 1200*1450*1950
Model Number: HZ-QG-2
cleaning and filling method: keg topside down
Weight: 260kg
Automatic Grade: Semi-automatic
Certification: CE ISO
Brand Name: Hisent
Type: Filling Machine
Driven Type: Electric or Steam
capable kegs: 5L-50L
Voltage: Customized
Packaging Material: metal,ss-304
Application: Beverage,beer
Power: 2KW/18KW
Delivery Detail: Shipped in 20 days after payment
Packaging Detail: plywood case with iron pallet
Qingdao Hisent Machinery Equipment Co., Ltd.
Gold Supplier
CN
Manufacturer, Trading Company
>24h
Response Time
100.0%
On-time delivery rate
-
-
Transactions
Visit Store

Specification and paramaters:

 

Exterior Dimension1200mm*1600mm*1900mm
Net weight240KG
Power2KW(Steam heating),18KW(Electric heating)
Capacity30-40 KEGS/H
Washing and filling modeKeg topside down
Applicable kegs5L-50L
air source pressure0.5-0.7MPA
Beer source pressure0.15-0.25MPA
Co2 source pressure0.2-0.3MPA
Cylinder valve pressure0.5-0.7MPA
Power voltageCustomized

Main Structures and Characteristics:

 

1.SIEMENS S7-200 control unit is adopted for automatic control of all processes. Washing, disinfecting and CO2 pressure preparation will be automatically finished.

2.lye water, disinfecting water can be recycled to save water.

3.Adopt pneumatic angle vale combination to ensure a safe work.

4.Frame, working station, pipeline and valves are all by stainless steel, all pipelines and pneumatic system are all closed cycle. Good look and stable.

5.Time parameters can be adjusted according to customers’ demands. If a procedure is not needed, you can turn the time parameter of this procedure to “0”.

 

The washer working procedure

Pressing → drain off → water washing → air blowing/drain off → hot soda-water washing → air blowing/to soda-water box → hot water washing →air blowing/drain off → hot water washing → drain off → steam sterilized (air blowing/drain off) →co2 blowing/drain off→ sterilized water washing →co2 blowing/to water tank→ co2 pressure preparing

 

The filler working procedure

Load the keg → Pressing → co2 pressure preparing → CO2 blowing spear → open the spear → filling → stop → unload the keg

 

CIP procedures at filling position:

Install washing accessory → start → spear cylinder open → time’s up → stop