Universal TFT Lcd Controller Board with HDMI input

$5.00 - $16.50
Min. Order
10 Pieces
GET LATEST PRICE ON APP
Company Information

Shenzhen Moko Technology Ltd.

CN Manufacturer, Trading Company
Response Time
24h-48h
Response Rate:
71.2%
Transactions
US$ 290,000+
11 Years Paid Supplier Gold Supplier Onsite Check Trade Assurance
Learn More

Quick Details

Port: Shenzhen&Hongkong
Payment Terms: L/C,D/P,T/T,Western Union,Paypal
Supply Ability: 2500 Square Meter/Square Meters per Week
Type: Standard
Place of Origin: Guangdong China
Model Number: MK-PCBA-R060
Brand Name: Moko
Production Name: Universal TFT Lcd Controller Board with HDMI input
Solder Mask: Black/Green/Red/Yellow/Blue/White
Legend: White/Black
PCBA Prototypes: 15~20days
PCBA Production: 20~25days
PCB Prototype: 3-5 days
Test: 100% E-test and Functional Test
Service Type: One-stop Turnkey Service
Certificate: UL,ISO9001,ISO14001,ROHS
Delivery Detail: 20-25days (Universal TFT Lcd Controller Board with HDMI input)
Packaging Detail: Inner Packing: Vaccum bags Outing Packing: High quality custom carton for Universal TFT Lcd Controller Board with HDMI input.

Welcome To Moko --  Universal TFT Lcd Controller Board with HDMI input

 

 

Company Information

 MOKO TECHNOLOGY LTD was founded in 2001, located in Shenzhen. We mainly offer One-stop OEM PCB Assembly Service. From our ISO9001:2008 certified factory, we turn out up to 10000 square meter of PCBs and 400000 PCBAs monthly. For assembly, utilizing 8 high-speed SMT lines from Yamaha and Sony, to meet customers' need. 

 EXPO

 

 

Our Services

Moko, your single point of contact for all of your raw materials, parts, and pcb assembly, also offers:

1.Fast PCB fabrication of samples and mass production (Available on FR4 and Aluminum).

2.Electronic components sourcing.

3.PCB assembly (Available on SMT,DIP and BGA).

4.Functional testing.

5.Stencil and housing assembly.

6.Reverse engineering (PCBA clone).

 

 

Product Description

1.Detailed Specification of PCB Manufacturing

1Layer1-30 layer
2MaterialFR-4,CEM-1,CEM-3,Hight TG,FR4 Halogen Free,FR-1,FR-2,Aluminum
3Board thickness0.2mm-7mm
4Max.finished board side800mm*500mm
5Min.drilled hole size0.25mm
6Min.line width0.075mm(3mil)
7Min.line spaceing0.075mm(3mil)
8Surface finish/treatmentHASL/HASL lead free,Chemical tin,Chemical Gold,Immersion gold Inmersion Silver/Gold,Osp,Gold Plating
9Copper thickness0.5-4.0oz
10Solder mask colorgreen/black/white/red/blue/yellow
11Inner packingVacuum packing,Plastic bag
12Outer packingStandard carton packing
13Hole tolerancePTH:±0.076,NTPH:±0.05
14CertificateUL,ISO9001,ISO14001,ROHS,CQC
15Profiling PunchingRouting,V-CUT,Beveling
16Assembly ServiceProviding OEM service to all sorts of printed circuit board assembly

 

2.Detailed Terms for Pcb Assembly

Technical Requirement:

1) Professional Surface-mounting and Through-hole soldering Technology

2) Various sizes like 1206,0805,0603 components SMT technology

3) ICT(In Circuit Test),FCT(Functional Circuit Test) technology.

4) PCB Assembly With UL,CE,FCC,Rohs Approval

5) Nitrogen gas reflow soldering technology for SMT.

6) High Standard SMT&Solder Assembly Line

7) High density interconnected board placement technology capacity.

 

Production Requirement:

1.Gerber Files (Eagle and PCB File are available).

2.BOM list.

3.Clear pictures of PCBA or PCBA samples to us.

4.Pick N Place file.

5.Test procedure for PCBA.

 

3.View of MOKO Factory

1)ROHS SMT WORKSHOP

SMT

 

2)High Standard Through-Hole Soldering Workshop

DIP

 

3)All goods after Testing Service

Testing.jpg 

4) MOKO advantages

Our advantages

 

3.View of MOKO Product

 PCBA.jpg

 

paste-pic-dp_uuid_ekdhd

Q: What files do you use in PCB fabrication?

A: Gerber RS-274X, 274D, Eagle and AutoCAD's DXF, DWG.

 

Q:What format of BOM do you prefer?

A: We prefer to Excel with components part number, manufacturer, quantity, value information. Of course, other format is ok.

 

Q: How long will your quotation be sent after I sent Gerber, BOM and test procedure?

A:  For PCB, our quotation will be sent within 6 hours. For PCBA, it's 2 working days. As for some special components, you could recommend suppliers to us.

 

Q: How can I know the process about my PCBA order?

A: Each customer will have a sale to contact. We'll email you about the process. You also could contact us by cell phone in urgent.

 

Q: Will all PCBAs be tested before delivery?

A: Yes, we ensure that each piece of PCBA products work well before shipping. We'll test all of them according to your test procedure. What you get from MOKO is high quality product.