Cheap modular house fast assembly two story steel structure warehouse

$20.00 - $80.00
Min. Order
500 Square Meters
GET LATEST PRICE ON APP
Choose your specifications
Company Information

Zhejiang Putian Integrated Housing Co., Ltd.

CN Manufacturer, Trading Company
Response Time
<24h
Response Rate:
75%
Transactions
US$ 30,000+
12 Years Paid Supplier Gold Supplier Onsite Check Trade Assurance
Learn More

Quick Details

Port: Shanghai or Ningbo
Payment Terms: L/C,T/T,Western Union,MoneyGram
Supply Ability: 20000 Square Meter/Square Meters per Month
Place of Origin: Zhejiang China
Brand Name: PTH
Model Number: steel frame warehouse
Use: Hotel,House,Kiosk,Booth,Office,Sentry Box,Guard House,Shop,Warehouse,Workshop,Plant
warehouse Certificate: ISO, CE
Main structure: H type column, Z type purlin, C type purlin
steel structure Wall system: EPS/Rock Wool Panel / Corrugated Color Steel
steel structure Roof: EPS Sandwich Panel / Corrugated Color Steel
Floor/foundation: PVC / Concrate
Window: Aluminum Alloy
Door: Steel Door, Auto Rolling Shutter
Crane: With or W/O
Insulation: Glass Wool
Complement: Skylight and Ventilator
Packaging Detail: Flat packing, main structure packed in an integrated rack made by H beams, other parts packed in cartons or crates, all loaded into 40FT HQ. Safe and easy handling.

1.jpg

Good quality prefab house/cheap prefabricated steel structure

workshop/low cost steel frame 

3.jpg

 3.jpg4.jpg

/

Main Parts

Item Name

Specification

Main Steel Frame

Column

Q235B, Q345B                        

H shape, Box, Steel pipe, Hot rolled steel

Beam

Q235B, Q345B 

H-beam 

Finish

 Shot blasting Sa 2.5, Zinc Rich Epoxy primer finish 100um

Supporting System

Brace

Q235B, Q345B ,  

Steel rod, Steel pipe, Angle steel. Galvanization 275g/m2

Roof Purlin

C or Z shape, Steel purlin

Wall Purlin

Q235B, Q346B

C or Z shape, Steel purlin

Roof

0.45/0.5/0.6mm corrugate steel sheet (Aluminum & Zinc coated AZ100g/m2+surface painting 20/5um)

50/75/100mm EPS,  Rock wool, PU, Glass wool sandwich panel 

Wall

0.45/0.5/0.6mm corrugate steel sheet (Aluminum & Zinc coated AZ100g/m2+surface painting 20/5um)

50/75/100mm EPS,  Rock wool, PU, Glass wool sandwich panel

Accessories

Bolts

Ordinary, High strength

Gutter

Galvanized Steel, Stainless steel

/

5.jpg

/

1.jpg

1.jpg

1.jpg 1.jpg

Click CONTAINER HOUSE for more information.

/

6.jpg7.jpg

 /

1.Contact us
Contact us by Phone/Email/LinkedIn/WeChat
2.Drawing and Quotation
Tell us what you want,our sales man and designer give you the best proposal.
3.Finalize contract
Finalize details for price,payment,shipment time,and sign the contract.
4.Producing
Start production upon receipt of down payment,the sales follows up the producing progress.
5.Inspection
QC team will make routine inspection in each process,and provide inspection report.
6.Packing&Shipment
Packing all the parts onto the steel rack , load into the shipping container ; contact shipping forwarder and ship to the final port as customer directed.
7.Install
PTH provide complete installation drawing,or PTH send engineer to the site to give the installation guidance.
8.After-sale service
Anytime,any problem,our sales man and engineer will try our best to help your solve it.

/

FAQ

1. Do you provide on-site installation service?

1) Only large projects provide installation services

2) General projects, we can provide Installation guide service based on customers’ request.

3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.

 

2.What’s your delivery time? 

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 30 days after receive deposit. Large order delivery time should be arranged separately.

 

3.How to control the quality of your product?

a. quality of the design: think about possible problems in advance and provide a high-quality design solution.

b. quality of the raw material: choose the qualified raw material

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.

 

4. How to deal with quality problems?

Warranty is 2 years. Within the warranty period, PTH will responsible for all quality problems caused by production.

 

5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, the service life of main structure is 25 years

 

6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region:   improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.