$1,000,000.00 - $2,000,000.00
Min. Order : 1 Set

Transporting and erecting bridge girder launcher crane

Quick Details

Port: Qingdao, Tianjin,or Shanghai Port, China
Payment Terms: L/C,T/T,T/T+L/C
Supply Ability: 50 Set/Sets per Month
Condition: New
Rated Lifting Moment: 9000kN
Warranty: 1 YEAR
Place of Origin: Henan China
rotation radius: 400m
Trolley speed: 0.3-3m/min
Minimum working curve radius: 2500m
After-sales Service Provided: Field installation, commissioning and training
Max. Lifting Height: 7m
Span: 25 30 32m
Feature: Bridge Crane
Certification: CE GOST ISO SGS
Beam car empty speed: 0-2.2KM/H
Brand Name: shenghuayuan
Beam velocity of beam: 0-1.5KM/H
Max. Lifting Load: 900t
Total power: 150KW
Power source: Three phase AC
Working system: A3
Crab speed: 0.5-5m/min; 0.3-3m/min
Lifting speed: 0-0.75m/min
Packaging Detail: Electric hoist and electricals are packaged by high quality plywood crates,main beams are packaged by plastic woven cloth for Transporting and erecting bridge girder launcher crane.
Henan Shenghua Heavy Crane Co., Ltd.
Gold Supplier
CN
Manufacturer, Trading Company
100%
Response Rate
0.0%
On-time delivery rate
-
-
Transactions
-
Employees
-
R&D staffs
-
Patents
Visit Store
Product Description

Transporting and erecting bridge girder launcher crane is my company independent research and development of walking type bridge erecting machine, the Transporting and erecting bridge girder launcher crane is a wide operation range, excellent performance, convenient operation, the safety of the structure of the railway special equipment. The main structural features of the main girder is the use of truss structure, lightweight structure, good wind resistance. This product can meet the large slope, small radius curved bridge.

Transporting and erecting bridge girder launcher crane
Our Company
Transporting and erecting bridge girder launcher crane

Henan Shenghua Heavy Crane Group is a big enterprise specialized in researching, developing, producing and exporting.
It mainly produces launching gantry crane, overhead crane and gantry crane, beam launcher, movable scaffolding system crane, form traveller, Transporting and erecting bridge girder launcher crane,  large span double girder shipbuilding gantry crane , straddle carrier, tyre transportor, beam trolley, portal crane and electric winch, electric hoist and all kinds of accessories, which widly cover machinery, metallurgy, electric power, railway, water conservancy, ports, terminals and other industries.
Shenghua Heavy Crane Group have more than 600 stuff, and covers 200,000 square meters.
Our advantages:
 More than 50 R&D personnels with advanced Science and technology.
 More than 400 sets advanced Production processing equipment and inspection equipment
 Independent intellectual property rights to develop energy saving bridge cranes, gantry cranes, and electric hoist
 Obtain ISO 9001 certificate and more than 10 series of patent certificates
 Efficient service and competitive products
 Export more than 100 countries

Factory Information
Transporting and erecting bridge girder launcher crane
Transporting and erecting bridge girder launcher crane
Transporting and erecting bridge girder launcher crane
Our Advantages

▪ An innovative design team to assure customized crane solution.
▪ We are the professional manufacturer to design,product,sale beam launcher 、launching gantry、gantry carne and so on.
▪ Changyuan County is Chinese crane-town & also our hometown.

Finished Project
Transporting and erecting bridge girder launcher crane
Transporting and erecting bridge girder launcher crane
Transporting and erecting bridge girder launcher crane
Certifications
Transporting and erecting bridge girder launcher crane
Packing & Delivery

1. Electric parts of Transporting and erecting bridge girder launcher crane are packed by high quality plywood crate, to reduce distortion in conveying;
2. Main beams, end beams and electric winch are packed by plastic woven cloth. It can reduce abrasion when transport.

Delivery: 

1. If the size of whole crane are suitable for container ship, usually by container; 

2. If the size is too big, usually by bulk ship or by container after truncation; 

3. Transport ways are based on reducing cost for you and keep the crane performance!  

Transporting and erecting bridge girder launcher crane
Customer visit
Transporting and erecting bridge girder launcher crane
Transporting and erecting bridge girder launcher crane
FAQ

1.What’s the information should I provide when inquiry about the Transporting and erecting bridge girder launcher crane?

1.1 we need the Bridge Drawing;the Maximum longitudinal slope and the Maximum Transverse slope; 

1.2 The Girder/beam drawing;
2. What are inspection standard for load test of Transporting and erecting bridge girder launcher crane?
2.1.Dynamic load test 

2.2 times rated load, main girder does not down deflection, all mechanisms work well, performance parameters meet the design demand, all limit switches and safety protection interlock devices are reliable, all spare parts does not have cracking and flexible connection, all motors and contactors are not overheat.

2.3Static load test

2.4times rated load, all mechanisms work well, the crane stops 20-30min as trial load is lifted 10cm high, then measure main girder down deflection(theodolite, ruler). Put down trial load to measure main girder upper camber, repeat 3 times, steel structure does not have permanent deformation;

3.How to make highway bridge concrete girders?

Highway Bridge concrete girders could be made by 4 methods:

3.1.Full span prefabrication

3.2 Segment girder prefabricationull span prefabrication,

3.3 Full span cast-in-place girder

3.4 Segment cast-in-situ

4.How about maintenance of Transporting and erecting bridge girder launcher crane?

4.1. Lubricating:Working performance and service life of all mechanisms of crane depend on lubricating to a big extent.

4.2 Steel wire rope:Fracture of wire has to be specially noticed. A new steel wire rope has to be changed immediately with the condition of broken wire, broken strands and wear loss to scrapping standard.

4.3 Spreader: The spreader has to be checked regularly

4.4 Pulley block:Mainly check rope race wearing condition, check whether wheel flange is cracked and whether pulley could get stuck in the axle or not

4.5 Wheels:Regularly check wheel flange and tread, a new wheel has to be immediately replaced as crack part or wearing in wheel flange reaches 10% of wheel thickness;Re-polishing has to be done as diameters between two driving wheels on tread differs more than D/600, or there are severe scar on the tread

4.6 Brake: Check one time per shift; The brake should be in accurate movement, and pins do not allow to be stuck. Brake shoes shall fit brake wheels correctly; the brake shoes interval shall be equal to open them.

Contact Us
Transporting and erecting bridge girder launcher crane