one component polyurea waterproof coating for bathroom

$1,000.00 - $1,500.00
Min. Order
1 Ton
GET LATEST PRICE ON APP
Company Information

Weifang Choice-Link Trading Co., Ltd.

CN Trading Company
Response Time
<24h
Response Rate:
40.9%
Transactions
---
5 Years Paid Supplier Gold Supplier Onsite Check
Learn More

Quick Details

Port: Qingdao, Ningbo, Shanghai
Payment Terms: L/C,T/T,Western Union
Supply Ability: 5000 Ton/Tons per Year
Place of Origin: Shandong China
Brand Name: None
Model Number: CLC-900
Type: Other Waterproofing Materials
Product Name: one component polyurea waterproof coating for bathroom
Packaging Detail: drumProduct Introduction Two-component polyurethane Waterproof Coating, easy to apply. With moderate viscosity, it can be self-leveling after construction under normal temperature. Excellent physical &amp; mechanical properties, good elasticity, high strength and firm bonding to base surface. Integral solidified film ability is high, and waterproof performance is good. Aging resistance, weather resistance, oil resistance and water resistance are remarkable and some acid &amp;alkali resistance. Besides its perf

one component polyurea waterproof coating for bathroom

 

Product Description

 

Introduction:

one component polyurea waterproof coating for bathroom is a kind of waterproof anti corrosion material with high content and high viscosity. It is made by mixing asphalt, rubber and other aids. It is black sticky paste in the normal conditions.

 

one component polyurea waterproof coating for bathroom  
is researched as the supplementary coating for spray quick set water proof coating. Spraying rapid hardening water proof coating has fast speed and high efficiency for large area coating, but it also has some shortages, such as small area coating, special part coating, spiral stair, etc. In order to solve such shortages, we brought in South Korea advance technique and developed out the manual one component rubber asphalt water proof coating.

 

one component polyurea waterproof coating for bathroom
can not only be used for partial coating but also be used for bottom reinforcement of spray type liquid rubber. It is suit for brush coat and roller coat. Its technical performance is almost the same as spraying rapid hardening water proof rubber coating.

coating03coating04

Features of product

 

1. Excellent malleability (800%) and recovery rate (90%)

2. No seam, coating as a total part ;

3.Can be worked on wet surface, shorten the working period and save manpower;

4. Outstanding chemical resistance and corrosion resistance ;

5. Excellent UV resistance and ozone resistance

6. Excellent adhesion with concrete, metal, wood, etc

7. Excellent water proof, anti corrosion performance

8. Convenient coating for small, complex parts

9.Can be used as the bottom reinforcement of similar spraying liquid rubber, together used with our other products

Applicable scope

For important waterproof engineering, edible pool, aquaculture, special pool, swimming pool, water pipes, with requirements of environmental protection waterproof engineering on groundwater, etc.

1241421990535.jpg201409171700592343353.jpg

Advantages of constr

 

1.Can be exclusive used or can be used with other waterproof coiled materials.

2.The coating is dry and not re-sticky after curing;

3.Not containing toxic and harm solvents like methylbenzene, di-methylbenzene, tri-methylbenzene, etc;

4.Not containing volatile solvent and strong smell;

5.For immediate use, it is convenient to use and can be flame plating and shelling-out;

6.Good function of physical mechanics, satisfying all indexes of typeⅠandⅡwaterproof coating.

7.The time of drying and curing is obvious shorter than national standard, which is good for construction stage;

 

Operating Guide

 

Base Course Requirement:

The base course should be clean, solid, smooth, no dust, grease and water.

Construction

 

1.Coating construction is generally 3~4 times, scraping and coating on the base course evenly with a rubber scraper or bristle brush after stirring. The first time coating film should be thin in order to prevent bubbling.

2.The construction protect layer must be done upon coating thickness had met the design requirement and gained acceptance.

3.Coating can be carrying on as soon as the prior film is non-stick.

4.In order to cohering the waterproof layer and other materials, you can add some coarse sand before the last coating becoming non-sticky under facade construction.

5.The direction of the prior and the next coating should be vertical and repeated for many times to make sure that the coating is completely saturating and cohering the base course. The second time coating can be carrying on as soon as the prior film is non-stick.

6.In order to cohering the waterproof layer and other materials, you can add some coarse sand before the last coating becoming non-sticky under facade construction.

7.The construction protect layer must be done upon coating thickness had met the design requirement and gained acceptance.

Cautions

 

*Do not construct under 5°C.

*Add a certain proportion of drier to ensure the curing time in low temperature. (Please ask technical support department for details.)

*Please wear protective clothing when you are working in order to avoid the coating contacting skin and eye. Keep ventilate.

*The coating must be tightly preserved if not running out.

*Do not construct in sleet and sand blown by the wind. Avoid constructing in high temperature at noon (prevent the coating bubbling and becoming sticky to feet).

*The products should be sealed storage in ventilated and shade place. Keep away from fire. Prevent sun and rain during transportation.

 

 Transportation and packaging:

 

*It must be stored in cool, dry and ventilated space.

 

*Avoid raining, insolating, squeezing and colliding during transportation to save the packaging.

 

COMPANY INFORMATION

waterproof-3

Choice-Link offers a range of high quality waterproofing solution-based products especially foe the prefessional .Our main products including:

Our company also export Dimple drainage board, Non woven polyester mat and Glassfiber mesh compound mat for bitumen membranes,Glassfiber mesh,Modified bitumen membrane production lines,etc.

        WhatsApp/Wechat: 86-15725662559
        Skype: wang.harvey88

cardscompany informationcertification (2) 

;