$20.00 - $60.00
Min. Order : 1 Set

LIJIN Manufacture Factory 200KG Per layer Powder Coated Metal Light Duty Warehouse Storage Rack Shelf

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: shenzhen port
Payment Terms: L/C,T/T
Supply Ability: 1000 Set/Sets per Month piece
Usage: Storage
Place of Origin: Guangdong China
Keyword: Customized Metal Shelf
Use: Industrial
Size: 2000*600*2000mm
Color: blue;white;orange red
Material: Steel
Loading Capacity: 200-500kg/layer
Model Number: LD-PJ0814
Feature: Corrosion Protection
Layer: Adjustable Layer
Depth: 0.6-0.8mm
Certification: CE; ISO9001; AS4084
Surface treatment: phosphorization
Name: Warhouse Metal Rack
Brand Name: LIJIN
Type: light duty rack
Weight Capacity: 200kg/layer
Product name: Metal Storage Shelf
Height: 2000mm
Width: 600mm
Finish: powder coated
Guangdong Lijin Storage Equipment Co., Ltd.
Supplier
CN
Manufacturer, Trading Company
88.9%
Response Rate
100.0%
On-time delivery rate
US$ 60,000+
24
Transactions
51-100
Employees
5-10
R&D staffs
0
Patents
Visit Store

lijinrack.jpg

Product Descriptions

3colors.jpg

LIGHT DUTY RACKING SYSTEM
LIJIN Manufacture Factory 200KG Per layer Powder Coated Metal Light Duty Warehouse Storage Rack Shelf
Product Name Specifications(mm) QTY Unit Remarks
- Oversize: L2000(Outside length)*D600*H2000
- Layers: 4 layers
- Weight capacity: 200kg/layer
- Color: blue, white and orange red
  Main Rack  1  Set
Remark:
 1.20GP can be loaded        about 75 set main
    racks; 40 HQ can be 
    loaded about 195 set      main rack.
2.Color, blue; white; 
   orange red ...
 Upright Frame  H2000*D600*75*35*0.6  2  Pcs
 Beam  L1830*60*40*0.6  8  Pcs
 Metal Deck  L915*D560*0.3  8  Pcs
  Addon Rack 1  Set
Upright Frame  H2000*D600*75*35*0.6 1 Pcs
Beam  L1830*60*40*0.6 8 Pcs
Metal Deck  L915*D560*0.3 8 Pcs

 

LIGHT DUTY RACK - DETAILS
001.jpg002.jpg003.jpg
Installation Step
      INSTALLATION STEPS
installation step.jpg
About Us

LIJIN_01.jpg

Certifications

33_02.jpg

Production Steps

LIJIN_03.jpg

Factory

11_04.jpg

Packing & Shipping

LIJIN_06.jpg

Exhibitions

LIJIN_07.jpg

Our Customer

LIJIN_08.jpg

FAQ

 Q1. What is your terms of packing?exhibition
A: Generally, we pack our goods in carton boxs and plastic bubble film.

Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages 
before you pay the balance.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.

Q4. How about your delivery time?
A: Generally, it will take 15 to 25 days after receiving your advance payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and 
the courier cost.

Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery.

Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
    2. We respect every customer as our friend and we sincerely do business and make friends with them, 
        no matter where they come from.

 

BACK TO HOME.jpg