1 1/2'' bathroom bath drain waste with plastic flexible pipe cable operated

$3.00 - $5.00
Min. Order
500 Sets
Quick Quotation
Company Information

Ningbo Master Building Material Co., Ltd.

CN Manufacturer, Trading Company
Response Time
---
Response Rate:
---
Transactions
US$ 3,000+
6 Years Paid Supplier Gold Supplier Onsite Check
Learn More

Quick Details

Port: Ningbo;Shanghai
Payment Terms: L/C,T/T,Western Union
Supply Ability: 50000 Set/Sets per Month
Place of Origin: Zhejiang China
Brand Name: Sanipro
Model Number: MST132002
Material: Brass
Surface Treatment: Chrome Plated
Style: Strainer
Application: Bathtub
Type: Drains
Delivery Detail: in 15-35days
Packaging Detail: 1pc/bag/white box,blister card or colorbox

                                   LOGO  .jpg

Dear Friends,

Thanks for visiting our product page.

Please check what you are interested in.

Any question,please just feel free to contact our salesmen for further help.

 

Product Details

 

1 1/2''  bathroom bathtub drain waste with plastic flexible pipe

 

1. Material: plastic main body with pipe;handle-zinc chrome plated

                    plug-stainless steel

2. Size: 1 1/2''

3. Type: cable operated

4. Surface treatment: polished & chrome plated

5. Weight: 320g

^. Pipe length: 550-770mm

132002.jpg

Application

.jpg

More products

.jpg

 

Workshop

 

500.jpg

 

Production Flow

 

Production Flow 500.jpg

 

Packing Details

 

 

Packaging: 1pc/bag/white box,blister card or color box, then into outer carton.

 

* We also can design the packaging according to customers needs.

 

Our Services

 

 

* Selections from our existing products

 

* Taylor made to suit customer need

 

* OEM products to customers design with complete new Molds and Dies fabrications

 

Payment Term

 

 

* Usually Pay by T/TL/C 

 

* We can also do other payment terms for small amount,such as paypal,western union ..etc.

 

 

Shipping Term

 

 

Loading Port: Ningbo or Shanghai, China

 

Sample Delivery: 7-10days for normal products in stock.

 

Mass Production Delivery: 20 -50days after sample confirmation