branch company in Australia,agents distributors in Australia
Packaging and delivery
Packaging Details
Accordion Windows
Step 1.Protective tape protects frames from scratches;
Step 2.Keep windows fixed on iron pallets;
Step 3.Tie up windows on the iron pallets with plastic belts;
Step 4.PE films keep windows away from sea water;
Step 5.Fill in the space between each two iron pallets by air bags;
Step 6.Tie up iron pallets in container with plastic belts.
Our packages will ensure the windows arrive at project jobsite in good conditions,contact us now,we will show you pictures.
Port
Shanghai
Supply Ability
Supply Ability
50000 Square Meter/Square Meters per Year Accordion Windows