Modular Workforce Camp Sandwich Panel Prefab House Largely Exporting

$50.00 - $70.00
Min. Order
50 Square Meters
Quick Quotation
Choose your specifications
Company Information

Foshan Bingcheng Steel Frame House Co., Ltd.

CN Manufacturer
Response Time
<24h
Response Rate:
77%
Transactions
US$ 1,000,000+
5 Years Paid Supplier Supplier Trade Assurance
Learn More

Quick Details

Port: Foshan/Guangzhou/Shenzhen/Zhongshan
Payment Terms: L/C,T/T,Western Union,MoneyGram,cash
Supply Ability: 3000 Set/Sets per Week
Place of Origin: Guangdong China
Brand Name: BingCheng
Model Number: BC20145
Use: Carport,Hotel,House,Kiosk,Booth,Office,Sentry Box,Guard House,Shop,Toilet,Villa,Warehouse,Workshop,Plant,family home
Type: Sandwich Panel Prefab House
Frame: Light Steel Frame
Roof &amp; Wall: Sandwich Panel
Sandwich Panel: EPS, PU, Glass wool, MGO.
Connection: Bolt Connection
Color: Blue, White, Red, Green, Yellow, etc.
Windows: PVC Siling Window
Door: Aluminium Alloy or PVC
Size: customerized
wind resist: 90-100km/hour
Packaging Detail: PVC film to protect the sandwich panel, nude package for the steel structure, accessroeis are carton or PVC film

Modular Workforce Camp Sandwich Panel Prefab House Largely Exporting

 

T_01

  

Product information

High quality, attractive appearance, attractive looks, practical use

  

 

 

Model numberT style prefab house for home
MaterialSandwich panel
ApplicationHouse/office/villa/hotel/others
SizeCustomized
Type systemPrefabricated house
Lead time10-15 years
Wind resistance

Grade 11

 

 

Product display

 

  

Product display

High quality, attractive appearance, attractive looks, practical use

  

2

 

The components of the steel structure have small section, light weight, easy to transport and installation, suitable for large span, high height, heavy bearing structure.

4

 

Suitable for withstand impact and dynamic load, with good seismic performance.The internal structure of steel is uniform with high reliability.

1

 

Factory mechanized production of steel structure components finished products of high precision, high production efficiency, site assembly speed, short construction period.

5

Product Feature

 

 Product Feature 

T_03

Attentions

This Modular Houses, widely used in buildings, such as temporary construction, urban constructionco and etc.. after emergency. 

  1.  Easier and fast to assemble and disassemble.

  2.  Simple and flexible decoration, environmental protection design.

  3.  Excellent characteristics of: strong anti-knock, sound proof, solid and appreciable, easier to install.

 

 
Product materials

 

  

Product materials

High quality, attractive appearance, attractive looks, practical use

  

 

T_04_02.jpg

 

  

Bingcheng service

High quality, attractive appearance, attractive looks, practical use

  

K_09.jpg

T_05_02.jpg

T_06

Main profile

 

  

Main profile

High quality, attractive appearance, attractive looks, practical use

  

 


 

1_17.jpg

More high quality service, please clickCONTACT US >

 

Company Introduction
 
 Company Introduction

1_19.jpg

 

Bingcheng has a very good reputation in the steel frame house indus- try since its establishment in the year 2009.

There are more than 100 employees, , 20% of whom are experienced engineers.People from Bingcheng managed successively to improve its products’ quality, such as the sandwich panel production line, C shape steel production line and welding line. Bingcheng has an annual production of 200,000 square meters of steel frame house.


1_21.jpg

 

Bingcheng Company has already exported products to more than 50 countries and regions, including Australia, Angola, Senegal, Kenya, Indonesia, Thailand, Uruguay, Chile, America, and UK. The company always focuses on research, development and innovation.

 

1_23.jpg

 

Contact Us

 

 Contact Us

 

NameLizzy
E-mail

manager@fsbingcheng.com

Wechat+086-13516623561
Mob+086-18927712482
Address

Zoumaying, Xiaotang, Shishan, Nanhai District,

Foshan City, Guangdong Province, China.

 

FAQ

 

 FAQ

 

 

1. How to install the houses in the site?

We can offer you three type of insisting on the installation:

1.1 : We can offer you the manual include the photos and drawings, or some videos for help you on the installation. And you will organize the local people to install it. 93% of our clients finished their houses in this way.

1.2: We can send our people to your site to guide your people to install. Or send team people (3-5 people) to your site to install for you. This way is most easy way, but you need to pay their round-way tickets, local food, accommodation, transportation, communication and salary, and also their security on the site. Almost 5% of our clients choose this way. And in the normal we will require the order should be more than 100000USD.

1.3: You can send your people (engineers or the technician) to our company to study the installation details. 2% of our clients choose this way for their orders.

 

2. The advantage of the prefab house.

2.1 : Recycle using: you can assemble it in the site A, then disassemble and install again in the site B, then site C. In such way, there is no industrial rubbish after you finish the jobs in the site.

2.2 : Low cost. The steel structure is much lower on the cost then the tradition building.

2.3 : Quickly installation. In the normal, 6 skilled persons team can install 150 sq.m house every day.

2.4: safety: the prefab house can resistance 7 grade earthquake, and 100km/H wind.

 

3. The mainly use of the prefab house:

In the normal it’s mainly used as temporary building in the site, such as temporary office, labor accommodation, etc. And in the recent years, the prefab house is largely use in the resettlement housing in some disaster area. In 2008, it played a major role on the resettling the victims after the terrible earthquake on 12th, May, 2008.

 

4. How to maintain your prefab house?

4.1: First of all, when the prefab house is installed, it's better not to make any other changes, like an expansion, adding partitions or cutting down the walls, or removing screws, and so on.

4.2  : Made the re-paint every 1-2 years after you install it. Such way can increase its service life and keep beautiful.

4.3 : Finally, do not tie the wire to the prefab house, which will lead to the prefab house uneven force and easily cause electric shock accident.
 

5. How to prepare the foundation for the K style prefab house?

In the normal we will offer you the foundation drawing to prepare the foundation. In the normal the K style house is the strip foundation.

 

6. How many flooring can the K style prefab house build?

In the normal we will suggest you to do the K style prefab house in 1 floor or 2 floors. And the highest one is 3 floors if you need. And will suggest you not build the house more than 3 floors by K style house. If you want to build the house more than 3 floors you better choose the design of T house design supported by the H shape steel

By the way, if you want to layout the toilet room in the K style prefab house, you’d better made it in the ground floor for the water proofing.

 
7. The materials option for the thermal insulation:
We have 3 materials for your option:
They are: EPS sandwich panel, glass wool sandwich panel, rock wool sandwich panel, PU (polyurethane) sandwich panel. You can get the details in the description of the sandwich panels.

 

 COME BACK TO THE HOMEPAGE >>