$0.02
Min. Order : 5000 Pieces
$0.01
≥10000 Pieces

Self-Adhesive Perforated Base Plate Pins Expansion Plastic Pins Double Pointed Weld Insulation Hanger Pins

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: Shenzhen
Payment Terms: L/C,T/T,Western Union
Supply Ability: 100000 Piece/Pieces per Day
Place of Origin: China
Head Diameter: 12GA , 14GA
Leg length: 1" to 10"
Color: Silver
Service: Online
Material: Steel
Model Number: WKD-001
Shank Type: smooth
MOQ: 5000pcs
Brand Name: MPS
Type: Perforated base pins
Packing: carton package
Product name: Perforated base pins
Head Style: Flat
Application: Construction Material
Packaging Detail: 1.Regular package :carton package 2.Custom package
Package Preview: https://sc04.alicdn.com/kf/H35f89015ce98487383d94411202fc86fB.jpg_640x640.jpg,https://sc04.alicdn.com/kf/H0f717f8ec84b41049e1e674d64ba7c8bl.jpg_640x640.jpg
Shenzhen Melparts Hardware Technology Co., Ltd.
Gold Supplier
CN
Manufacturer
≤8h
Response Time
28.6%
On-time delivery rate
US$ 10,000+
15
Transactions
Visit Store

   

General description

The perforated base hangers are designed to fix efficiently insulation on concrete and any other rough surfaces. It consists of a pin, firmly mounted on a perforated base.Locking washers supplied in each box.

Technical specification

Base

Material

Galvanized steel / Stainless steel

Dimensions

50 x 50 mm (2” x 2”) ,25X25mm(1X1)

Thickness

0,4 mm (28 ga.)

Perforation

44 holes, dia. 3.0 mm

Shank

Material

Mild steel(Galvanized or copper coating)

Stainless steel ,Aluminum

Diameter

2,7 mm (12 ga.)

Lengths

32 to 270 mm (1-1/4” to 10-5/8”)

Locking washer

 

Material

Galvanized spring steel/ Stainless steel

Diameter

Round : 30mm , Square:1-1/8 X 1-1/4””

Thickness

0.4 mm (28 ga.)

Edges

Bevelled

Storage

Store in a dry place

 

Application  

Apply adequate adhesive to the underside of the hanger, or use rivets or screws.

 

 

Position the hanger and press until the adhesive seeps through perforation.

 

 

 As soon as the strength of adherence is sufficient, impale the insulation on the hangers.    Please consult your glue supplier to know about the drying time.

 

 

Secure with CL locking washers.  If necessary cover the point with a  protective cap.

 


- (1)- (6)- (5)- (2)- (3)- (4)