$8.00
Min. Order : 1 Piece
$2.00
≥100000 Pieces

Low MOQ square shapes aluminium lipstick filling mold OEM lipstick moulds single hole

Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: NINGBO PORT
Payment Terms: Western Union,D/P,D/A,T/T,MoneyGram
Supply Ability: 500000 Piece/Pieces per Month
Product Material: Aluminium
Brand Name: CHIRM,CHIRM
Place of Origin: Zhejiang China
Keyword: 8 holes lipstick mould
Hole size: 360mm*40mm*24mm
Product name: square shapes aluminium lipstick filling mold OEM 8 holes
Number of holes: 8
Mould weight: 388g
Mould length: 360mm
Product: Lipstick,Household Product
Material: aluminum
Model Number: QM-FM04 (For QM-L21)
Shaping Mode: Filling mould,Sculpture Mould
Packaging Detail: carton/cap,bottom, in bulk tray packing need pay USD0.008 per piece
Ningbo Qimei Articles Co., Ltd.
Supplier
CN
Manufacturer, Trading Company
≤5h
Response Time
91.7%
On-time delivery rate
US$ 4,000+
24
Transactions
51-100
Employees
1-4
R&D staffs
0
Patents
Visit Store

QM-M006(QM-L21 filling mould-10QM-M006(QM-L21 filling mould-7QM-M006(QM-L21 filling mould)-8QM-M006(QM-L21 filling mould-9QM-M006(QM-L21 filling mould-6 

1_07.jpg1_08.jpg

Q1:About color?
A1:We supply any color according to client demand.

 

Q2:About free samples?
A2:Yes, samples are free.But express cost is on buyer’s account.

 

Q3:About combine different items in one container?
A3:A container can include different items, but each item should reach MOQ.

 

Q4:About the normal lead time?
A4:For stock products, we will send goods to you within 1~7 days after receiving your payment.

For mass production, lead time is around 15~20days after confirming samples and receiving 30% deposit.

 

Q5:About the trad terms and payment terms?
A5:Trade terms: FOB&CIF, C&F.
Payment term:T/T, 30% in advance, 70% balance payment before shipping.

 

Q6:About shipping terms?
A6:For small trial order, FEDEX,DHL,UPS,TNT etc can be provided.
For larger order, we can arrange shipment by sea or by air according to your requirement.

 

Q7:About control the quality?
A7:We will make samples before mass production, and after sample approved, we will begin mass 
production.Full inspect twice on assemble line by professional machine.Spot check every two hours.
Finished product and packaging inspection.

 

Q8:About design new product?
A8:We have a development team with excellent designers who will develop new products according to client demand.

 

-2_07.jpg