$30.72 - $43.72
Min. Order : 1 Unit

YCQ9M Model ATS 125A 250A 400A 630A 3P 4P automatic transfer switch 400V ATS

Get Latest Price
Trade Assurance
Built-in order protection service in alibaba.com
Product quality
On-time shipment
More on shipping and other trade services.

Quick Details

Port: Ningbo/Shanghai
Payment Terms: L/C,D/A,D/P,T/T,Western Union
Supply Ability: 80000 Unit/Units per Week
Poles: 3P, 4P
Mechanical life: 5000
Place of Origin: Zhejiang China
Electrical life: 1000
Rated inpulse withstand voltage(KV): 8
Model Number: YCQ9M
Certification: CE
Brand Name: CNC
Rated short circuit breaking capacity (I: 25-50 KA
Rated operational voltage (Ue): AC 400V
Max. Voltage: AC 400V
Whether the smart: YES
Rated operational current (Ie): 16,25,32,40,50,63,80,100,125,160,180,250,....400,630
Max. Current: 630A
Original: YCB9M
Rated frequency: 50Hz
Packaging Detail: CNC Packing standard packaging
Changcheng Electrical Group Zhejiang Technology Co., Ltd.
Supplier
CN
Manufacturer, Trading Company
≤13h
Response Time
84.1%
On-time delivery rate
US$ 110,000+
119
Transactions
301-500
Employees
11-20
R&D staffs
0
Patents
Visit Store


400A 3P ATS



400A 3P ATS



400A 3P ATS

 

Product Description

400A 3P ATS 250A 4P 125A automatic transfer switch

400A 3P ATS

Full automatic power supply changeover system,It has communication interface with built-in RS485, and has two kinds of communication agreement including MODBUS-RUS and electric meter 1997, which can r

Product Detail

Original YCB9M
Rated operational current (Ie) 16,25,32,40,50,63,80,100,125,160,180,250,....400,630
Rated operational voltage (Ue) AC 400V
Rated frequency 50Hz
Poles 3P, 4P
Rated short circuit breaking capacity (I 25-50 KA
Mechanical life 5000
Electrical life 1000
Rated inpulse withstand voltage(KV) 8
Product Keywords 400A 3P ATS,250A 4P ATS,125A automatic transfer switch

YCQ9M ATS
1.Ensure un-interruptible service of critical electric power When overvoltage, under-voltage or phase failure occur to a power supply, it willautomatically switch over to another power supply or start the electric generator.It is mainly used in hospital, shopping mall, bank, hotel, high buildings and firecontrol where long time power disconnection is not allowed and ceaseless powersupply is needed.

2.Full automatic power supply changeover system It is equipped with three changeover methods including self-throwing and self- reset (power network to power network), self-throwing and not self-reset (powernetwork to power network), self-throwing and self-reset (power network to powergeneration), in order to satisfy different power changeover requirement.

3.Intelligent
It has communication interface with built-in RS485, and has two kinds ofcommunication agreement including MODBUS-RUS and electric meter 1997,which can realize real time data upload, distance data configuration and conditionmonitor, and can achieve the function of telecommand, telemetering, remotecontrol, and remote regulating. Remote vision can be achieved through matchingintelligent power distribution system.

4.Safe and reliable, and have fire control linkage function When fire disaster occurs to no fire control load, fire protection control center cansend signal to intelligent controller, cut off double power supply, ensure firedisaster load to break.

Company Information
400A 3P ATS

ABOUT US

The Changcheng Electrical Group Co,.Ltd ,specialized in manufacturing industrial electrical appliance.
CNC holds assets with more than 5 billion RMB,and the plant area amounts to 0.25 million square meters,with over 10,000 emplyees.

CNC   Deliver Power For Better Life!

400A 3P ATS

History
400A 3P ATS

1988

Originate the Yueqing ChangCheng Electrical Components Factory

1995

Established Zhejiang Changcheng Electrical Group

 

1997

Became a national non-regional group,and passed the ISO9000 system

2007

Shanghai Industrial Zone was completed as manufacture plant for transformer and switchgear.

Our Advantages

OUR ADVANTAGES

 
 
400A 3P ATS

PROFESSIONAL

1.Have 31 years experience in electrical . More than 15 engineer in factory, 
2.We divide sales areas for salesmen to better serve customer :Europe/Russian/Africa... 

High Quanlity (Q&C)

1.We set up advanced assembly line,test center, R&D Center and quality control center.
2.We have got the certificates of ISO9011,CE,
SEMKO,KEMA,Rohs,UL...

R&D

1.We have strong R&D capability
2.New designed products are developed every year by R&D

Strength

China Top 500 Enterprise
China Key Industrial Electrical Laboratory

Provincial Industrial Design Center Of China

Packaging & Shipping

400A 3P ATS

FAQ

FAQ

1. Could I have prices of your products?

Welcome. Pls feel free to send us an email here. You will get our reply in 24 hours

2. Can we print our logo/website/company name on products?

Yes, please advise the size and Pantone Code of the logo.

3. What's the lead time for regular order?

7-15 days for order quantity lower than 5000pc; For more quantity, usually 20 days.

4. Can I get a sample before the bulk order?

Yes, we welcome sample order to test and check quality.Mixed samples are acceptable.

5. Do you inspect the finished products?

Yes, each step of production and finished products will be came out inspection by QC department before shipping.

Contact Us

400A 3P ATS