GETO has set up a special R&D team with over 200 members.GETO successfully developed GETO-BIM and GETO-VR inspection software,co-engineering in the development of the automatic punching machine and intelligent robot welding.
Port: | Shenzhen Port |
Payment Terms: | L/C,T/T |
Supply Ability: | 500000 Square Meter/Square Meters per Month |
Formwork Panel Surface Treatment: | Mill/Coated |
Warranty: | 1 Year |
Place of Origin: | Jiangxi China |
Formwork Panel Material: | Aluminum Alloy 6061-T6 |
System Type: | Tie-Rod System/Flat-Tie System |
Usable Range: | Wall, Column, Beam, Slab, Staircase |
Project Solution Capability: | 3D model design,Cross Categories Consolidation,graphic design,total solution for projects |
Usable Life: | 300 times |
Design Style: | Modern |
Model Number: | 6061 |
After-sale Service: | Free spare parts,Online technical support,Onsite Inspection,Onsite Installation,Onsite Training |
Formwork Panel Weight: | 22-25kg/㎡ |
Brand Name: | GETO |
Formwork Panel Bearing Capacity: | 60KN/㎡ |
Type: | Formwork |
Formwork Panel Thickness: | 4mm |
Application: | Building Construction(Villas, Apartment, High-Rise Building),Apartment |
Frame Height of Formwork Panel: | 63.5mm/65mm |
Packaging Detail: | In Pallet |
Items | Aluminium formwork |
1. Material | Aluminium alloy 6061-T6 |
2.Installation | After short period of training, workers can easily learn to install and dismantle the formwork. |
3.Construction period | 3-5 days per storey. |
4.Machine assistance | Does not require crane for shifting and assembly, allowing the crane to be used for other activities that would have needed to be delayed for conventional formwork system, such as: 1) Shifting of reinforcing steel rebar into assembly point 2) Removing debris from site 3) Loading and Unloading materials from trucks into site storage area. |
5.Quality of formwork | The aluminium formwork is firm enough that will not burst, which can save the cleaning cost and the concrete won’t be wasted. |
6.Plastering cost | As the smooth effect after removing the formwork, there is no need to plaster. |
7.Formwork stability | The load capacity is 60 KN per sqr meter,which can generate good integrality and uniform load. Aluminum formwork is firm that will prevent formwork from shifting. |
8.Scrap value | The scrap value is about 50% of the new panel. |