Brass Water Heating Stainless Steel Manifold for Heating with Double Hand Wheel Plated with Nickel HVAC System

$1.50
3000-4999 Pieces
$1.20
5000-9999 Pieces
$0.90
10000-19999 Pieces
$0.50
>=20000 Pieces
Min. Order
3000 Pieces
GET LATEST PRICE ON APP
Choose your specifications
Company Information

Ningbo Jiekelong Precision Manufacturing Co., Ltd.

CN Manufacturer, Trading Company
Response Time
<24h
Response Rate:
86%
Transactions
US$ 80+
11 Years Paid Supplier Supplier Trade Assurance
Learn More

Quick Details

Port: Ningbo or Shanghai
Payment Terms: L/C,T/T
Supply Ability: 30000 Piece/Pieces per Month
Place of Origin: China
Brand Name: jklong
Model Number: F615
Function: Floor Heating Systerm
Application: Underfloor Heating System
Certifications: ISO9001
Size: M30*1.5
MOQ: 1000
Material: Brass
Output ( standard ): 100W/m2
Brand: TOUPWELL
Style: Casual
Keywords: Brass Heating Manifold
Packaging Detail: polybag &amp; box, standard exporting carton or as per request

brass water heating stainless steel manifold for heating with Double Hand Wheel Plated with Nickel HVAC System

JKL

2.jpg 

Product Description

 

brass water heating stainless steel manifold for heating with Double Hand Wheel Plated with Nickel HVAC System

brass water heating stainless steel manifold for heating with Double Hand Wheel Plated with Nickel HVAC System

  1. Material: C3771, C37700, CW617N, CW602N, as per request
  2. Handle: Forged Steel, Aluminum, Flat Steel with plastic cover, Butterfly “T” type
  3. Thread: BSP, NPT, ANSI BI 20.1, as per request
  4. Size: 3/4" to 1"
  5. Working Pressure: 2.5MPa
  6. Working Medium: Water, non-corrosive liquid, non-corrosive air
  7. Working Temperature: -20°C≤t120°C
  8. Forged brass body with chrome plated solid brass ball
  9. Sealing: EPDM, PTFE, Teflon   

 

Our Strengths:

1.Fast Material Supply—our parent firm has copper bar company.
2.Supplier of national projects—Bird’s Nest, Shanghai World Financial Center
3.Automated and robotized machines –increase efficiency reduce cost

4.OEM & ODM projects welcomed
5.ISO9001 & ISO14001 approved
6.Rich experienced engineers and customized after service.
7.Annual R&D projects reach the number of 100
8.Toyota Production System and ERP Management System
9.Seven Step QC Process
          1) Material Control

          2) Machining Quality Control

          3) In-coming Material Inspection

          4) Assembly line Quality Control

          5) 100% leakage testing

          6) Final Inspection before delivery

          7) American Standard air&water pressure testing

 
 

 

 

Main product

About us

3.png4.png 

Exhibitions &project

5.png 

Certificate

6.jpg 

Export

7.png10_02_01.png.png